Laserfiche WebLink
RECLAMATION COST SUMARY cont~d sheet 3 of 4 <br />X. EARTXNORK -STREAM CXANNEL RECONSTRUCTION <br />Tesk Mo.l Tesk Description I Cost (f) <br />---- I ------------------______----------------------- I °--------- <br />I I <br />I I <br />- - - __------~----- ----------------------- <br />Subtotal (H): <br />eve:_ ve ve <br />1. EARTHSKIRK -DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task No.l Tesk Description I Cost (f) <br />-___-_ I _______________-___-__-_------_-___-__-_~_-_ I _--~-___-_ <br />I I <br />I I <br />I <br />I I <br />I I <br />1 <br />------------------------ <br />Subtotel (I>: <br />J. EARTXNORK -TOPSOIL/SUBSOIL REPLACEMENT <br />Tesk No.l Task Description I Cost (f) <br />--__'___I-_-------------------------------------~_.-.-.--'-I------'_-_- <br />7 ~ Dort Topsoil for Lwer Portal Area I (12,390 <br />14 I Import Topsoil for Upper Portal Area I f9, 530 <br />I I <br />I I <br />I I <br />Sibtotal (J): (27,920 <br />