Laserfiche WebLink
• Colorado Division of Minerals and Geol~ <br />Task M: 13 Prep, by: JD <br />Date:--- 12/22/94 Permit M:M78091UG <br />' Penait Action: Final Recleaietian <br />it Task Description: Smooth Grade Topsoil <br />XOIIRLY EgUIPMENT COST <br />ESTIMATING FORM - BULLD02ER WRK <br />Task Fite Neaw:: M1UG-13 <br />Mine: Goldin Yorder Mine <br />Besie Machine: Cat D7G. <br />Blade Type: Straight <br />Attaclwaent ft1: ROPS Cab <br />Attachwent Y2: M/A <br />Horsepower: 200 <br />Shift Basis: 1/dey- <br />Cost Breakdown: <br />------------- Utilization X (code CSO) <br />Ownership cost/hr = (32.57 N/A <br />Operst ing i overhaul cost/h r- dozer = f28.57 100 <br /> -ripper = f0.00 N/A <br />Operator cost/hr = f21.58 N/A <br />Total eqp[. unit cost/hr = f82.72 Total fleet Lost/hr: (82.72 <br />MATERIAL gWMTITIES <br />Initial Swell Loose <br />Yoluan: 968.0 CCY Factor: 1.125 Volume: 1,089.0 LCY <br />i Source of quantity take-off: Calculat ion <br />Source of est. swell factor: Program <br />HOURLY PRODUCTION - <br />_______________ Jab Condition Correction Factors <br />Avg. push distance: 300 tt. ----------^------------ -------- <br />--------- Operator.......... 0.75 (avg.) <br />Urodj usted hourly Mat. consistency.. 1.20 (Cat tbl) <br />dozer production: 171 LCY/hr Doz irq wethod..... 1.00 (pen.) <br />--------- Visibility........ 1.00 (avg.) <br />Materiel consistency: Job efficiency.... 0.83 (1eh/day) <br />Loose stockpile Transnissi on type. 1.00 ( PS ) <br />------------------------------------ Grade edjustnent.. 1.01 (Cat tbl) <br />Avg. push gradient: 0.50 X (nag) Altitude adj. .... 0.92 (Cat tbl) <br />--------- Material weight... 1.00 (Cat tbl) <br />Avg• site altitude: 9500 ft. Blade type........ 1.00 (S or U) <br />Materiel weight 2300.00 lb/LCY Net Job Correction 0.69 <br />Ne[. Descr.: ---- ------- <br />GENERAL FILL Adjusted Unit Prod.: 118.47 LCY/hr <br /> Adjusted Fleet Production: 118.47 lCY/hr <br />JOB COST ___- -__~_- <br />Fleet size 1 Dozers) Total Job Tiny: 9.19 Hours <br />Unit Lost f0.698 /LCY Total Job Cost: 5760.32 <br />