Laserfiche WebLink
~ ~ III IIIIIIIIIIIII III <br />999 <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman St.. Room 215 <br />Denver, Colorado 80?03 <br />Phone: 13031 866-.3 567 <br />FAQ: 1303) 832-8106 <br />File No.:C-82-055 <br />MEMO TO FILE <br />Operator: Energy Fuels Mining Company <br />~~ <br />DEPARTMENT OF <br />NATURAL <br />RESOURCES <br />Roy Romer <br />Governor <br />lames 5. Lochhead <br />E*ecutive Detector <br />Michael B. Long <br />Date: 9/26/95 Division Director <br />Specialist: Janet Binns ,\ <br />Subject: Raton Cre Mi ,repairs to Starkville Gulch, RSD#1, and SLr04 Bond Release <br />Requests for the Santa Fe Loadouts. <br />Type of Interaction (Meeting Phone, Other): I contacted Mr. Al. Weaver by phone <br />(719)784-6395 in response to a voice mail message from him. <br />Person(s) Contacted and Affiliation: Mr. Al Weaver, Energy Fuels Mining Company <br />SUMMARY AND RESOLUTION OF INTERACTION: Al had called to notify the Division <br />that there had been some damage to the Starkville Gulch diversion west of the short 8-foot <br />diameter road crossing culvert. EF was having repairs done to the riprap in those locations. <br />He gave me an update that they have a contractor working on the repairs to RSD#1. He <br />also wanted to discuss what needs to be done for the Santa Fe Loadouts for bond release. I <br />told him he needs a final plan for the drainage. The Division looks upon silt fence as a <br />temporary structure. At the time of the bond release inspection the site should be in its final <br />configuration. I informed the operator that Energy Fuels should consult with the landowner, <br />Atchinson Topeka and Santa Fe Rail Road, on what their final site and drainage <br />configuration needs are. Once Energy Fuels and the railroad have a final plan, the Division <br />should receive a letter from the railroad confirming what has been agreed upon. I expressed <br />to Al that there shouldn't be any structures that require regular maintenance left at the time <br />of final release. I also suggested that clearer definition of the boundary be marked prior to <br />the bond release inspection. These can be temporary markers if needed. <br />m:\roal\sharc\(orms\5720 <br />