My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV90728
DRMS
>
Back File Migration
>
Revision
>
REV90728
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:12:24 AM
Creation date
11/21/2007 11:06:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981034
IBM Index Class Name
Revision
Doc Date
1/7/1999
Doc Name
MEMO RED CANYON MINE 1 PN C-81-034 HYDROLOGY REVIEW FOR PHASE II AND III BOND RELEASE APPLICATION
From
DMG
To
MIKE BOULAY
Type & Sequence
SL2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Mathews, Routten <br />Page 4 <br />January 7, 1999 <br />River Basin. These may be applicable if Ward Creek eventually discharges to the Colorado River. <br />With respect to surface water impacts, I think it would be reasonable to verify the PHC predictions <br />by looking atavailabledataforWazdCreek. Has the operatorverifiedthepredictedimpactstoWazd <br />Creek? If the data are available, we and/or the operator should check and see if the PHC predictions <br />are consistent with baseline and recent data from Ward Creek. <br />Finally, the Red Canyon Mine Piezometer Abandonment Report was reviewed and determined to <br />be generally in compliance with our rules and was deemed acceptable as submitted. On page 130 <br />of the bond release application, drill hole abandonment for holes not completed to aquifers is <br />discussed. However, there is no discussion of well abandonment for holes that intercepted aquifers. <br />There should be some mention of this in the bond release application. Reference to the Piezometer <br />Abandonment Report or inclusion of the report into the bond release application would suffice. The <br />remaining four wells (A-(,A-2, E-1, and R-3) will need to be reclaimed prior to bond release. <br />c: David Berry <br />
The URL can be used to link to this page
Your browser does not support the video tag.