My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1992-04-01_REVISION - M1988112
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
1992-04-01_REVISION - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2021 3:50:24 PM
Creation date
11/21/2007 11:05:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
4/1/1992
Doc Name
QUALITY ASSURANCE QUALITY CONTROL PROTOCOLS FOR THE COLLECTION OF SURFACE & GROUND WATER QUALITY
Type & Sequence
TR6
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' <br /> ~ <br /> ~'~' <br />CORE LABORIATORIES <br />_ Western Atlas <br /> Inter ~ational <br /> w.. v.o. <br />' riYlE <br /> ANALYTICAL CHEMISTRY DIVISION QUALITY ASSURANCE MANUAL <br /> SOP N0. REVISION N0. EFFECTIVE GATE PACE <br /> HC-QAC-02 0 1 /06/92 94 of 104 <br />' <br /> 14.8 Data Review And Approval Documentation <br />I' Verification of all primary laboratory functions (from samples receipt and log-in <br /> to final report approval) is documented in each job file. The following items <br /> are reviewed, approved, dated, and initialed by reporting personnel, laboratory <br /> section supervisors, project managers, the QA/QC coordinator, or the <br /> laboratory manager prior to sending the final analytical report to the client. <br /> • Log-In Verification <br />'' • Data Complete <br /> • Data Verification <br />~' • QA/QC Acceptable <br /> • Report Approval <br /> Log-In Verification <br /> A { <br />i <br />l <br /> aboratory manager <br />aboratory sect <br />on supervisor, project manager, or the <br /> verifies that sample receipt procedures and chain-of-custody completion) <br /> instructions were properly followed by the sample receipt/log-in technician. <br /> This verification process includes checking that all chairwof-custody and <br /> parameter request information corresponds to the information entered into <br />' LIMS. <br /> Data Complete <br /> <br /> Reporting personnel, group leaders, project managers, or laboratory section <br /> supervisors initial and date the data-complete section of the documentation <br />' stamp after all assigned analytical parameters have been completed. <br />t Data Verification <br /> Laboratory section supervisors, ~rou' leaders, re'ortin„ersonnel, the QA/OC <br /> coordinator, or the laboratory manager must review and approve the items <br />' specified in section 14.3 prior to initialing and dating the data- verification <br />1 area of the documentation stamp. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.