My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_REVISION - M1980244 (30)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
_REVISION - M1980244 (30)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2021 8:12:00 AM
Creation date
11/21/2007 11:04:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Name
Appendix E
From
Cripple Creek & Victor Gold
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
scheduling and ealydinnting construction activities with rcyuirrd C Q:\ tcet:ng end <br />activities; <br />• ^ ocersecing the construction yunlity control operations prrformcll by CONTR 4C TOR. <br />.: approve specific rnrtcctivc measures to be implemented during cunswction when <br />dcciations from the SPkCIFIC:\TIO'`S occur. <br />l ensure that reyuircd quality assurance testing has been performed in accurdunce with the <br />CQ.A Plan and to the satisfaction otthe CQA Monitor, and <br />y ensure that the C'QA penanncl arc provided with all document:uion requirrd in the CQ:\ <br />Plan and project SPLCIPI('AlIUNS. <br />:,03 DI VI,\ F ~(J~Ft R: <br />In thi, (QA Plan. DFtiIGN F:NGINF:ER rctcrs specifically to Golder Associates Inc. DF'tiIGN <br />ENGINEER is the mdnulu,d or tine rrspcxt,iblc tin the deslut anJ pmparation nl'thc DRA\\'IN(iS :md <br />SPECIfIGTI'IOVS. DESI(.N ENGINF.F.R is responsible tin approving all DESIGN and <br />SPEC'IPICA T'IC)\ changes, modifications, or clarificatiurts rneountercd during consmrctiun. <br />:.01 CERTIFYING F:NGI\F:I[R: <br />In this plan. C'ER'I'IF1'ING ENGI\FF:R rckn spetifically w (I'u Be Dctenninedl C'GRIIF'YIN(: <br />fNGINEF:R i, the individu;d or lino responsible fur ccnitying the comtnlctiun sras pcrtilrmcd in <br />• arnpliarcc ,liih the DFt.4\l'Ihli\ .md tiPh.CIFIC:\TIONS M4VAGFR and CF:R'fIF')ING <br />E NGI\EF:R ,hall he resplmsibk for dlr rcsl+lution of all yunlih .1„ur:ms nmlr,. <br />..OS CONSlRO('TIONQI':\LI'I'1' 4StiUK:\\('F. )10\IfOR: <br />fhc CQA Monitor is the firm or individual responsible (or pcrfomtinf: the CQA tasks outlined in this <br />CQA Plan. The CQA \tumtor is the o(licial CQA rcprcscntmivc of CC'&Y and has the rcslxmsibilin of <br />userxeing the ('V:\ nspccts of the Work. In this CQA Plan the CQ:\ Muniwr is associated with the <br />CERTIFYI,\G ENGINEER, acrd re(er~ specifically to ffu 13c Ihtemrincdl. the CQA Monitor has thr <br />uudanin to stop arty uspcct ol'the Work that is nut in alntpli;mce rsBh the CQA Pl:ut. Work wTxdd then <br />be restuned once curtective action hv_s been appnvcd M' M.4\:4Gt:K I he specific responsibilities ofthe <br />C~QnA Monitor include: <br />t~ review the DR:\~4IUG5, \PF('II'IC'ATIUNS, and related guidance documents; <br />rcvicrv all CON 1'R,\('TOR VC ,ubmittnls and make appropriate recommendations; <br />~y obtain prcconstruction and construction samples and perform material evaluation testing <br />as rcquircd; <br />r-r <br />sY: mnnin+r inundation prcparatirnt activities as discussed in Section 6.02.01 anJ material <br />piacemem as discussed in Section 6.0_'.02; <br />^ assure that testing equipment trsed and tests performed rue conductc~l according to <br />tiPECIFIGITIONS and industn standarJz. <br />• ^ document and rtport test results a+ \1:\\,\GF:R; <br />~retion a I:WI.I Pale ? u(I tl Mxreh ?_', 20Q0 <br />fiurth,surk, CVA Plan Golder Associates Revision 5 <br />D WNU/ n Y„• (r^1',M,(>*ll T'#Yr,UI\ 4 Il C11Mll A{. SITCUk'A::I1F,'CI W;^+hX <br />
The URL can be used to link to this page
Your browser does not support the video tag.