My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_REVISION - M1980244 (30)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
_REVISION - M1980244 (30)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2021 8:12:00 AM
Creation date
11/21/2007 11:04:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Name
Appendix E
From
Cripple Creek & Victor Gold
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A. CONTRACTOR shall test a minimum of one destructive test sample per five hundred (500) <br />feet of seam length from a location specified by CERTIFYING ENGINEER. <br />CONTRACTOR shall not be informed in advance of [he sample location. The samples shall <br />be taken centered over the seam and prioritized as follows: <br />1. A minimum of one sample per day; <br />2. All areas identified as suspect during seaming non-destructive testing/monitoring, <br />and in unusual working conditions. <br />3. A minimum of one sample for each geomembrane seamer. <br />4. A minimum of one sample every five hundred (500) feet of seaming <br />B. Samples shall be cut by CONTRACTOR as the seaming progresses. Sampling locations <br />shall be determined by CERTIFYING ENGINEER. CQA Monitor must witness the <br />obtainment of all destructive test samples by CONTRACTOR. CONTRACTOR shall mark <br />all samples with their seam number, date, welding machine number, welding technician <br />identification, extruder and nozzle/wedge temperature, and ambient air temperature. <br />CONTRACTOR shall document the date, time, roll and seam number, ambient temperature, <br />and pass or fail description. All holes in the geomembrane resulting from obtaining the seam <br />samples shall be immediately repaired. All patches shall be vacuum tested. <br />C. The samples shall be a minimum twelve (12) inches wide by twenty-four (24) inches long with <br />the seam centered lengthwise. The sample shall be cut into two equal length pieces, half to be <br />given to CC&V and the other half kept by CONTRACTOR. <br />D. CONTRACTOR shall cut and test ten (10) one (1) inch wide specimens from his sample. All <br />testing shall be conducted at room temperature (60° F - 80° F) CONTRACTOR shall test <br />five (5) specimens for seam shear strength and five (5) for peel strength. Both inside and <br />outside tracks of fusion seams will be tested for peel strength. To be acceptable, four (4) out <br />of the five (5) specimens must pass according to criteria established in Article 2.01. Any <br />specimen that fails through the weld or at [he weld/sheet interface shall be considered a <br />failure, unless the weld strength exceeds the sheet strength, as discussed in Section 2776, <br />Item 2.01. The tensiometer shall have a grip separation of four (4) inches plus the width of the <br />seam. The seam is to be centered between the clamps. The grip separation rates for LLDPE <br />are twenty (20) inches per minute for shear and twenty (20) inches per minute for peel. These <br />tests shall not fail according to the criteria in Article 2.01. <br />E. CQA Monitor must witness the testing of all destructive samples. Destructive tests will be <br />performed within two (2) days of the samples being obtained. <br />Failing tests shall be subjected [o additional testing until a passing area is found. A passing <br />area is defined as a seam(s) bounded at each end by a passing destructive test. Seams will be <br />tracked in each direction until a passing destructive test is found or until a previous passing <br />destmctive lest is reached. Seams will be tracked according to the welding apparatus and the <br />machine operator. The following procedures shall apply whenever a sample fails the field <br />destructive test: <br />1. CONTRACTOR can retrace the welding path to an intermediate location (at a <br />minimum of ten (10) feet from the location of the failed test), at CERTIFYING <br />ENGINEER discretion, and take a small sample for an additional field test. [f this <br />test passes, then the seam shall be cap stripped between that location and the original <br />. failed location. If the test fails, the process shall be repeated. <br />Section 02776 Page 18 of 20 October 25, 2000 <br />Geomembrane Golder Associates Revision 8 <br />D:WHASEIV PSSA CERtWPPENDICIESUPPENDIX E TECHNICAL SPECIFICATIONS\W}:!p99p1)p61R8 DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.