My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_REVISION - M1980244 (30)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
_REVISION - M1980244 (30)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2021 8:12:00 AM
Creation date
11/21/2007 11:04:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Name
Appendix E
From
Cripple Creek & Victor Gold
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• PART I: GENERAL <br />1.01 SUMMARY: <br />This SPECIFICATION describes requirements for the manufactwe, fabrication (if needed}, supply, and <br />installation of polyethylene geomembrane for lining of the valley leach facility, as shown on the <br />DRAWINGS; and construction quality control monitoring and testing. All procedwes, operations and <br />methods shall be in strict compliance with the SPECIFICATIONS, Constmction Quality Assurance Plan, <br />and the DRAWINGS. <br />1.02 SUBMITTALS: <br />A. CONTRACTOR shall provide the following information relating to the geomembrane <br />MANUFACTURER and INSTALLER with its proposal. <br />1. Information from the MANUFACTURER including company name, address, telephone <br />number, the names of the company president and quality control manager, and narrative <br />of the company history. <br />2. Information from the MANUFACTURER on factory size, equipment, personnel, <br />number of shifts per day, and capacity per shift. <br />3. Quality Control Manuals from the MANUFACTURER and INSTALLER for the <br />installation and testing of the geomembrane, including trial seams, seaming, <br />nondestructive testing, destructive testing procedwes, repair procedures and in-field <br />quality control forms. Upon review of the Quality Control Manuals, MANAGER may <br />request additional testing during the manufacturing process at no additional cost to <br />CC& V. <br />4. A list of at least five completed facilities from the MANUFACTURER totaling a <br />minimum of 5 million (5,000,000) square feet between all five facilities of the type of <br />geomembrane that is being installed at the Cresson Project. Each entry in this list <br />should specify the name and purpose of the facility, its [ocation and date of installation, <br />the name of the owner, the project manager, designer, fabricator (if any), and the <br />geosynthetics installation contractor and the name and telephone number of the contact <br />at the facility who can discuss the project. In addition, the geomembrane thickness and <br />total square footage of the installation surface should be included. <br />5. Installation capabilities of the INSTALLER. <br />6. Information on equipment and personnel from the INSTALLER. <br />A list of at least five completed facilities, totaling five million {5,000,000) square fret <br />for which INSTALLER has installed the type of geomembrane that is being installed at <br />the Cresson Project. For each installatioq the following information shall be provided: <br />a. Name and purpose of facility, its location, and date of installation. <br />b. Name of owner, Design Engineer, MANUFACTURER, Fabricator, if <br />applicable, and name and telephone number of contact at the facility who can <br />discuss the project. <br />c. Thickness of geomembrane and surface area of the installed geomembrane. <br />Section 02776 Page 1 of 20 October 25, 2000 <br />Geomembrane Golder Associates Revision 8 <br />D:IPHASEIV PSSACERTWPPE\DICa;S~APPENDI%E TECMVIC.IL SPECffICATIONS,991-309902T)61R8 DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.