My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_REVISION - M1980244 (30)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
_REVISION - M1980244 (30)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2021 8:12:00 AM
Creation date
11/21/2007 11:04:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Name
Appendix E
From
Cripple Creek & Victor Gold
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
breaks in grade), unless othenvisr directed by ~L1tiAGF.R 1'he Record Drawings sit;tll include <br />drvations and Ivcativnn fur the tullewine. <br />• i Undrrdrain plan view showing the limits of the Salley Irnch facility. Underdrain <br />fill and undrrdmin alignment, with elevations even apprc±vimatcly IOU tcrt or <br />on even break in grade <br />^ Diversion channel plan and prolile view along the divenion chnnnrl alignment <br />a. Leak detection trench plan view showing the limits of the valley leach facility. <br />Itak dctcctivn trench alignment. and kak detection sumps, with clrvxtions even <br />opprocimately 100-feet <br />~i Soil Liner Fill plan view showing the limits of the valley Irach factlity, with <br />contours of the Soil Liner fill and Eirdding fill surface on a 10-foot contour <br />interval. including the regraded ore slopes and end berm, <br />r <br />~~ Lmv Volume Solution Collection piping plan showing the limns of the <br />composite liner, double liner and single liner, and piping alignmen[ with <br />elevations every appruximaeely 100 feet <br />~I Perimeter access roads <br />^ I op of I:pper gcosynthetics in the Prcgnxnt Solution Storage Area, including the <br />\'emcal Riser Sump anJ bax plates <br />• ^ I Iigh \'vlumc Solution Collrctivn piping plan showing the limits of Phase III. <br />.md piping alignmrnt with elevation every appro~itnately 100-ket <br />In :nldition, the Colorado licensed surveyor will provide a sttrveyot's certificate to be submitteJ in <br />the Qmstrtutivn Ccnificution Rapon, <br />C Submittal. <br />COS"TRACTOR will wbnm completed :ts-built doeumenuftivn within seven (7) calendar days <br />upon annpleli~m ufihe work in the Following manner. <br />I tiubnut nsn t') rcprcxlucihlr copies (myhtr) to the ~1A\ACFR. <br />'.. Submit two t?) non-reproducible copies to the UA~AGE:R on 113M compatible <br />compact disks (C'UI un AutoCAU Vcrsivn IJ.O or newer fonnut. <br />D. Thc C'O\ I R,\CTOR will be rrspunsiblc for prrfonning the Colluwing wrvEww activities <br />associaaf ,~ dh the C'onnwctivn Certification Report: <br />I. Provide nonhmg. casting. and elevnticxt for all k,il Liner fill depth verifications. <br />2. Provide northing, ranting, and rlevution Cor geonxmbnutc panel intersections and <br />dcswctive samples. <br />• <br />Section 01050 Page 2 of 3 March 22. 2000 <br />Construchon Slaking Golder Assouates Revtston 3 <br />O'V1a$EN V3.G ~(AMr'hEbGtSMPEM7UI E , ECMrN(IL S~EC61l:Ar,pNS9~67aRJ OCC <br />
The URL can be used to link to this page
Your browser does not support the video tag.