Laserfiche WebLink
8. Coarse Shaft Backfill -material as approved by MANAGER and CERTIFYINC <br />ENGINEER conforming to the following SPECIFICATIONS: <br /> <br />U.S. Standard <br />Sieve Size: Percent Passing <br />6 D Wei hf <br />12-inch 100 <br />No. 200 0 - 15 <br />Plasticity Index: <br />9. Fine Shaft Back£]l -material as approved by MANAGER and CERTIFYING <br />ENGINEER conforming [o the following SPECIFICATIONS: <br />U.S. Standard <br />&ieve Size - Percent Passing <br />b D We' tit <br />2-inch 100 <br />3/4-inch 70 100 <br />No. 40 20 - 50 <br />No. 200 2 -15 <br />Plasticity Index: <br />10. Pipe Bedding Material -material as approved by MANAGER and CERTIFYING <br />ENGINEER conforming to the following SPECIFICATIONS: <br /> <br />U.S. Standard <br />Sieve Size Percent Passiag <br />~ b D Wei ht <br />2-inch 100 <br />No. 4 30 - 100 <br />No. 200 5 - 20 <br />Plasticity Index: <br />1 I. Granulaz Filter Material -material as approved by MANAGER and CERTIFYING <br />ENGINEER conforming to the following SPECIFICATIONS: <br />tLS. "Standard <br />. Sieve Size Percent Passing <br />b D Wei ht <br />3-inch 100 <br />2-inch 75 - 100 <br />No. 200 0-15 <br />PART 3: EXECUTION <br />20 maximum <br />5 maximum <br />5 maximum <br />3.01 CLEARING AND GRUBBING: <br />A. Cleazing and grabbing shall be done within the footprint of the limits of the construction area, as <br />delineated on the DRAWINGS. Clearing shall extend a maximum of IS feet and a minimum of <br />10 feet outside of the construction limits or as directed by MANAGER. Areas for clearing shall <br />be released to CONTRACTOR by MANAGER. No pioneering of roads across undisturbed <br />areas shall be allowed without prior approval of MANAGER. <br />6. No clearing shall be performed until written permission is given by MANAGER and until the <br />CONTRACTOR has provided construction staking for the proposed work. Clearing shall <br />consist of cutting brush to the ground level, removing such material, along with wood, rubbish, <br />Section 02200 <br />Earthworks <br />D~PNASEIV PSSA CEI <br />Page 4 of 17 <br />Golder Associates <br />TECFLNICAL SPECffICAT10NSW220pRl.DOC <br />Mazch 22, 2000 <br />Revision 7 <br />