My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_REVISION - M1980244 (30)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
_REVISION - M1980244 (30)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2021 8:12:00 AM
Creation date
11/21/2007 11:04:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Name
Appendix E
From
Cripple Creek & Victor Gold
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
^'(la~~mtmP~ranc- dcnsiq~(Ati'i\1D1505) <br />• cartmn black content IASTM D160.i) <br />duckness (GKI-(;\181 <br />tcncilr strength 1.4STM D638) <br />:111 ccnt:~;;r.,tn~:: :c,t. •L.d'. °r prrlormrd in contphance ++irlt the ; ro~crt ti!'!( IFIC.4fIUN>. the <br />CQA Man•,Gr, .!i,tli r,•t:rt+ ~!.. .r.t feiult5 and shall repun am noncoat~~nn.c,rr i.t :hr DL4\AGFK. <br />CF.RI Ifl 1\G F.\(;I\EI'It .:r.i d:c Cirosvmhctics Installauun CO\ TR:\C TOR. <br />6.U3 CO\57721C11O\::\10\IlY)RI\(. A\U fl.\FI\G: <br />I'hc ('Q,1 Monitor shall monitor and test ttll grosynthclic cornponcnts of the cwatruaion to scrip that <br />the construction is in compliance with the project SPFCIf1C'AilO\S. lfte CQA Monitor shall <br />idrmifi inadryuate construction methodologies or materials sshidt may adscrsrly hnpact the <br />prrtitrrnance of the (acilin• Ixing construcmd and existing structures. Visual observations throughout <br />the construction process shall be mode [o ensure that the materials arc placed to the lints and grades as <br />shown un the DKAN"1V(.;5. <br />Thr CUA monitor shall rcvirw the following submittals by INSI'.41_LF:R during the project <br />t~ verification that a qualified land surveyor has verified all lir.c+ and wades: and <br />u, <br />~~. subgra,!c ~nrt.u~ ,u.cl~:encr certific:nts for each area n. hr coveted by Ihr lining syslent. <br />sigttrdM iii; I\~I:U.LFK. <br />Ihr ('QA Monitor shall: <br />• ^ Inspect all gcasynthetic m:nerinls delivered to site. ilte CQA Monitor shall document <br />am dtunagc and notify MAM1A(:FR: <br />L~ uhmm grcnynthetic packaging identification slips for verification nttd gencmtiun of nn on- <br />sitz ntatrri:ds inscnwry; <br />(~1.1 obsrrvc subgrade conditions prior to gzosynthctics installation and verity that any <br />drticicncirs. as dctinr(t in Section U2?UO of the SPECIFICATIONS. arc curnYtrd: <br />~.`.ti: obsrrvc prrmerent anchoring of gcusynthetics to verify that design and project <br />SPIiCIFICA Il(+\S arc met: <br />`J observe that required oserlap distances are met: <br />~. monitor and record ambient air temperatures: <br />ra: vrnt}~ that no contimuuts horizontal crams an placed on slopes unless approved by <br />CEKTIFI'ING F:\GIVEEK; and. <br />~a obsrrvc and ducuntcnt that all soil materiah placed on top of the geosynthrtics arc done <br />in such a manner as Io ensure thin the geus)nthetics are nut damaged. <br />• n.u3.0I GEU11F.?IISK:\\F.: <br />Section OI s00? Pa¢c G of I l March 2'_, 't1011 <br />Gcosynthctic CQA Ilan Golder Associates Revision 5 <br />b'JK114'1+'1'65A rFE 1'.VIRM1OKIFY AFR?M%l n:(NtiM'AI. 51'k UIJC \no4+aI~:ID p+%' <br />
The URL can be used to link to this page
Your browser does not support the video tag.