Laserfiche WebLink
iRo~v1: HOM AKE • • <br />I O `DECEIVED <br />ROY R. CELLAN MAR 2 p 2000 <br />CORPORATE MANAGER ~ ~j~ A`e ~~ ~~ ~. •~ o(Vinerab 8 Geology <br />RECLAMATION p ~ v <br />6 March, 2000 ~~~~:~~g., `2/®P~I'' <br />~y% ~~ <br />State of Colorado ~; ~ A <br />~0,. Division of Minerals and Geology eP°r <br />Durango Field Office ~O~6h <br />701 Camino Del Rio, Room 125 <br />Durango, CO 61301 <br />ENVIRONMENTAL, HEALTH. SAFETY <br />AND GOVERNMENT AFFAIRS <br />Received <br />~uR i ~ zoou <br />Din of Fats 3 HfCe <br />Geolpgj, <br />Attn: Mr. Steve S. Shuey, Reclamat' <br />Doc. l/a~C <br />RE: Bulldog Mine Reclamation Proiect ~ February, 2000 Monthly Monitoring Report <br />~_ <br />Dear Mr. Shuey: <br />Pursuant to the Technical Revisions to the Reclamation Permit for the Bulldog Reclamation <br />Project, this is the twenty-seventh monthly report pertaining to 11 installation and operation <br />of an infiltration trench to accommodate seepage from the 9360 adit, and 2) closing the <br />valve at the 9360 adit plug. The Division of Minerals and Geology IDMGI, in a letter dated <br />March 6, 1999, issued a conditional approval for Homestake Mining Company (HMC) to <br />close the valve at the 9360 adit plug. Subsequent to DMG's approval, HMC closed the <br />valve to the adit plug on April 1, 1999. Since closure of the adit plug valve, no flow was <br />directed into the infiltration trench. Monitoring of the hydraulic conditions behind the adit <br />plug indicated that as of August 25, 1999, conditions had stabilized (ie pressure <br />measurements stabilizedl. As a result, DMG approved initiation of the planned tracer test <br />(Ref: Letter from WMCI to Mr. Steve Shuey, dated August 27, 19991. The tracer test <br />subsequently began on September 9, 1999. With the initiation of the tracer test, HMC is <br />committed to the monitoring summarized in Table 1 in accordance with the approved <br />Technical Revisions. <br />The revised monitoring program was initiated in September 1999. A summary of the <br />monthly monitoring data is presented in Table 2. Based on the required visual inspection <br />around the adit plug, the plug is impounding water behind it with no signs of seepage and/or <br />development of seeps around the portal area. No flow was observed in DT-1 or DT 2 during <br />the monthly sampling activities. Windy Gulch was either frozen or dry in all observed <br />reaches, including the 9700 Weir and the WGL Weir. As a result, no water or charcoal <br />samples were collected for tracer analysis during this period. <br />As part of this monthly report and in accordance with the 9360 Level Adit Closure <br />Monitoring Plan, dated April 1998, Windy Gulch monitoring was continued during this period. <br />Significant freezing of Windy Gulch was observed in early November 1999. Consequently, <br />the instrumentation recording flow measurements at the WGL Weir was removed to prevent <br />damage, and continuous flow monitoring, initiated in April 1999, was discontinued for the <br />winter. As such, a water quality sample and record of flow rate were not taken at the WGL <br />Weir during this period. Water levels in the Creede Formation Well, locatedupslope of the <br />9360 Adit, have been recorded continuously since its installation, and data for the last year <br />are presented graphically in Figure 1. <br />HOMESTAKE MINING COMPANY <br />P O RO% 90 • GRANTS, NM 81020-OOi I <br />