My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV90579
DRMS
>
Back File Migration
>
Revision
>
REV90579
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:12:17 AM
Creation date
11/21/2007 11:04:05 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Revision
Doc Date
5/5/1992
Doc Name
NORTH DECLINE TR 13 FN C-810041
From
POWDERHORN COAL COMPANY
To
MLR
Type & Sequence
TR13
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the rock fill will be in accordance with Army Corps of Engineers' speci- <br />fications, since a permit from the Corps is necessary for placement of <br />the material. The size gradation will be submitted to the Division after <br />it is determined in conjunction with the Army Corps of Engineers. <br />A flow path for the emergency spillway water from sediment pond No. 8 <br />is shown on Exhibit 6B. The flow path is through ditches and culverts <br />maintained by the Colorado Department of Highways. <br />The revised design calculations for the upper and lower flumes for the <br />Roadside Mine North diversion ditch are included in Appendix F of this <br />submittal. The flumes are designed to have at least 0.3 feet of freeboard. <br />During the reclamation phase of the North Decline area the east and west <br />diversion ditches will continue to be used to divert unaffected runoff <br />around the reclaimed area. The intermittant stream channel will be reestablished <br />as a wide rip rapped channel. Pond 7 will be enlarged to accomodate more <br />of the reclaimed area drainage east of the channel. Shallow depressions <br />will be used for areas east and west of the channel which can not be drained <br />to Pond 7. Exhibit 12C shows the reclamation phase drainage and Appendices <br />X, WW and AAA contains the drainage design calculations. <br />Ute Water Conservacy District is proposing to install a water supply pipe <br />line from their plant located in section 2,T.115.R98W. to Island Acres <br />State Park which is located in section 26, T.lOS.R.98W. Of the routes <br />investigated their preference is to install the line in a northwesterly <br />direction to the Interstate 70 and follow the highway from there. This <br />preferred route crosses our Roadside refuse pile skirting the south side. <br />See Exhibit 6 A & B for the location where the line crosses the refuse <br />-178- <br />(Revised 5-4-92) <br />
The URL can be used to link to this page
Your browser does not support the video tag.