My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1982-06-01_REVISION - M1977215
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977215
>
1982-06-01_REVISION - M1977215
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2021 1:22:36 PM
Creation date
11/21/2007 11:04:00 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977215
IBM Index Class Name
Revision
Doc Date
6/1/1982
Doc Name
PHASE 1 REMEDIAL MEASURES FOR LOWER TAILINGS DAM
From
HOMESTAKE
To
MLRD
Type & Sequence
HR1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~~~ <br />CONSULTING ENGINEERS. INC. <br />Sune 17, 1981 <br />Project No. RM81-271 <br />L <br />rIy <br />Ly <br />C Mr. Thomas M. Robertson <br />Resident Manager <br />Bulldog Mountain Operation <br />Homestake Mining Company <br />P. 0. Box 100 <br />Creede, Colorado <br />Phase I Report <br />F Remedial Measures for Lower Tailings Dam <br />Bulldog Mountain Operation <br />Dear Tom: <br />This letter report presents the results of Phase I work by D'Apppolonia <br />Consulting Engineers, Inc. (D'Appolonia) to develop remedial measures for <br />[he Lower Tailings Dam at the Homestake Mining Company's (Homestake) <br />Bulldog Mountain Operation. As outlined in our March 6, 1981 letter, a <br />four-phased approach is proposed to define and solve the seepage problem <br />a[ the Lower Tailings Dam. Phase I consists of analyzing existing <br />information and data recently collected at the site by Homestake. <br />I[ was planned [hat Phase II would be implemented if Phase I was inade- <br />quate to define the seepage path(s) and/or remedial measures. Phase II <br />would involve additional subsurface investigation to define the seepage <br />conditions. Phase III is the development of conceptual remedial measures, <br />and Phase IV consists of the final design of the selected remedial <br />measure. The information, analyses, and conclusions of Phase I and <br />recommendations for Phase II are contained in this report. <br />1.0 BACKGROUND <br />The Bulldog Mountain Operation is located approximately one-half mile <br />northwest of Creede, in south central Colorado. The Lower Tailings Dam <br />is located approximately one mile southwest of Creede and approximately <br />one mile south of the older upper tailings dam, as shown in Figure 1. <br />~.' The Bulldog Mine is an underground silver mine which uses a cyanide leach <br />process Co recover [he silver from [he ore. Tailings which result <br />from the milling process are pumped to a pond behind the Lower Tailings <br />Dam. <br />10 DUFF ROAD. PITTSBURGH. PA 15235 TELEPHONE: <12 /263-3200 TELE%: 81-2378 <br />DENVER. CO BECKLEY, WV CHESTERTON. IN WILMINGTON. NC HOUSTO N. T% BRUSSEL S. BEL GIUM TEH ERAN. IRAN <br />
The URL can be used to link to this page
Your browser does not support the video tag.