Laserfiche WebLink
<br />Comment by James Stevens <br />1. Consideration should be given to adding samples of the leak detection system to the <br />bi-weekly sampling program. This was previously done on a monthly basis, but with <br />the increase in cyanide levels in the pond, a higher sampling frequency seems <br />resonable. <br />2. Well M-2 is listed for both bi-weekly and quarterly sampling. It shoulid be removed <br />from the quarterly list. <br />3. As a reasonable extra precaution to increase the accuracy of sample results and <br />eliminate any possible effects of contamination by equipment, the sampling sequence <br />should be from those monitoring points historically having lower values of cyanide <br />to those having higher levels. <br />M:\MIN\BMGPROTO <br />6/I/92/SCG <br />