Laserfiche WebLink
The Cripple Creek & Victor Gold Mining Company requests that the appropriate OMLR <br />representatives meet immediately with CC&V, representatives of the design engineer, and the <br />construction engineer to ensure that CC&V has answered all questions in a manner satisfactory <br />to the OMLR and that, with the information and plans submitted herein, the two-foot thickness <br />is acceptable. We request that the meeting be in the next few days because of our need to <br />proceed with the scheduling of the processing of Drain Cover Fill. <br />Upon acceptance of the plans detailed in this letter, CC&V will update the technical <br />specifications for review and acceptance by the OMLR. <br />Thank you for your efforts. <br />E. <br />Environmental Affairs <br />Attachments (2): 1. Test Summary Mositure Content and Density Soil Liner Fill Placed in <br />Phase I Pad During 1995 Construction (1 page). <br />2. Vibrating wire piezometer locations for Phase I1 LVSCS dated 4/ 17!96 <br />(2 pages). <br />FILE: CC&VSTIP.006 <br />10 <br />