Laserfiche WebLink
-3- <br /> <br />u <br />10. Primary future _ Cropland(CR) _ Pastureland(PL) General Agriculture(GA) <br /> (Post-mining) Rangeland(RL) <br />Forestry(FR> XX Wildlife Habitat(WL) <br /> land use _ <br />_ <br />Residential(RS> Recreation(RC) Industrial/Commercial(IC) <br /> (check one): _ Developed Water Resources(WR) _ Solid Waste Disposal(WD) <br />11. Primary rp esent Cropland(CR) <br />Pastureland(PL) General Agriculture(GA) <br /> land use _ <br />_ <br />_ <br />Rangeland(RL) _ Forestry(FR) Wildlife Habitat(WL> <br /> (check one): _ <br />Residential(RS) Recreation(RC) Xx Industrial/Commercial(IC) <br /> _ Developed Water Resources(WR) (existing mine) <br />12. Method of Minin g: XX Quarry (QR) _ Solution (SO) <br /> 12a. Other: Briefly explain mining method (e.g. Placer, truck/shovel). <br /> Open pit surface with blasting, crushing, screening, distribution. <br />13. On Site Processing: Solution <SO) Chemical (CH) _ Thermal (TH) <br /> _ Heap Leach (HL) _ Vat Leac h (VU <br />14. Application Fee : <br /> The application fee for Quarry mining is $2,325. <br /> The application fee for Solution mining or any Chemical or Thermal Processing <br /> is 83,100. <br /> If none of these methods or processes are to be included in the operation then the <br /> application fee is 81,875. <br /> The application fee for conversion to a 112 permit is 81,50 0. <br /> 112 Amendment application fee is 81,550. <br />An applicant will not be issued a reclamation permit until notified by the Division that <br />this application and the required performance and financial warranties have been <br />approved. Alternatively, an automatic approval will occur where the Division fails to <br />notify the applicant/operator that the application has been denied. The final agency <br />action must be made within 120 calendar days from the date the application was <br />submitted. However, the performance and financial warranties must be approved by the <br />Division or Board before a permit will be issued even if you receive an automatic <br />approval. NO MINING OPERATIONS SHALL BEGIN UNTIL A PERMIT IS ISSUED (Rule 7.2(2)). <br />It shall be a provision of this permit that the operations wili be conducted in <br />accordance with the terms and conditions listed in your application, as well as with the <br />provisions of the Act and the Mineral Rules and Regulations in effect at the time the <br />permit is issued. <br /> <br />