Laserfiche WebLink
The only processing on site will be crushing operations to produce sized aggregate. No <br /> chemical processing is anticipated on the site. Aggregate products for County road and parking <br /> construction and maintenance will be produced. <br /> Drainage will be managed by detention ponds in phases 4 and 5. These ponds will hold <br /> runoff waters and release overflows at a detennined rate into the natural drainageways. Erosion <br /> control of runoff precipitation will be managed by straw bale at appropriate points to slow runoff <br /> velocities and discourage sediment build-up in the detention ponds. <br />