Laserfiche WebLink
,~-~ - r <br />STATE OF COLORADO <br />OFFICE OF THE STATE ENGINEER <br />Division of Water Resources <br />Department of Natural Resources <br />1313 Sherman Street, Room 818 <br />Denver, Colorado 80203 <br />. - <br />Phone (303) 866-3581 Response to Reclamation Permit Application Consideration C <br />FAX (303) 866-3589 ~ <br />C ~~® <br />wwwwa[eas[ate.co.us <br />DATE: Apri128, 2005 <br />APR z ~ 1005 <br />TO: G. Russell Means, Environmental Protection Specialist ilivisian of ryyi <br /> ,, and GeolaBY <br />CC: Division 5 Office; District 50 Water Commissioner <br />OF'~~L. <br />*/ o <br />'* <br />~ 1876 ~ <br />Bill Owens <br />Governor <br />Russell George <br />Executive Director <br />Hal D. Simpson, P.E. <br />State Engineer <br />FROM: John Redding, Water Resource Engineer / <br />RE: Operator: Moffat Limestone Company, Juniper Quarry, File No. M-1982-141 <br />Section 15, Twp 6N, Rng 95 W, 6th P.M., Moffat County <br />Landowner-United States (BLM) _ <br />CONDITIONS FOR APPRO V AL <br />® The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground water must not <br />occur during or after mining operations. <br />^ The proposed operation will consume ground water by ^evaporation, ^dust control, ^reclamation, ^water <br />removed in the mined product, ^processing, ^other: <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a gravel pii or other type <br />of well pemilt, as applicable. Prior to obtaining a pemtit, an approved water supply plan or decreed plan for <br />augmentation is required. <br />^ Prior to approving a well permit, the applicant must conduct a field inspection of the site and document the <br />locations of all wells within 600 feet mile of the permit area. The applicant must then obtain a waiver of <br />objection from all well owners with wells within 600 feet of the pemtit area or contact this office regarding the <br />600 Foot spacing notification hearing process. <br />® The proposed operation may have potential impact on existing water rights near the project location. Please <br />provide evidence that [he proposed project will not alter or impact the historic operation of existing water rights. <br />^ The applicant has indicated plans to use other water for: <br />® Other: Water stored in sediment ponds must be released to nearest stream system within 72 hours of capture. <br />COMMENTS: <br />