My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV90255
DRMS
>
Back File Migration
>
Revision
>
REV90255
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:12:01 AM
Creation date
11/21/2007 11:01:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982186
IBM Index Class Name
Revision
Doc Name
EXHIBIT D
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXH161T E (2) <br />BEESON PiT <br />M-82-186 <br />MiNiNG PLAN <br />SE OF THE NW 114 <br />21-10S-45W <br />I <br />i ~;~-~ <br /> <br />'•. <br />_~; <br />\. <br />--= <br />,, . <br />y~:. <br />r~ <br />~~ <br />~~ <br />~; <br />~;;; ., <br />.,;~,- <br />`~ r _ d rtnc~ <br />~._ <br />O C ~ ~ 7 <br />~ - mrr, .~ <br />_~,; , <br />r <br />i <br />I nom/ ~' <br />f~ <br />~I~ <br /> <br />_y~ <br /> <br />i <br />~-~ <br />xr-~ ~~..~~`" <br />~~ ~rC <br />G ~ ~cfC= spa' <br />~ ~~\ <br />2(b} No other avmets within 200 feet of the previous and amended areas. (See e~tibit A) Also, no man-made <br />structu2s within 200 feet of the affected area. <br />Z(c) Topsoil stockpile will be in the northeast comer of the original permitted area. Just a note: Topsoil aviNae <br />uti4ized as much as possible in the immediate reclamation of "just mined and finished" areas. <br />2(d) Construcaan material exirac5on will oc:.ur in a west-south dire ion. <br />1.13.7 Substitute for Notice of Temporary Cessation <br />This mining operation may be intermittently active during the entire mining period, with periods cf <br />inactivity exceeding one (1) year. This notice shall serve as a substitute Notice of Temporary <br />Cessation. If inactivity exceeding one (1) year does occur on this miningoperation, then on the Annual <br />Report, the following will be reported: <br />1. the condition of fhe operation at the time of cessation; <br />2. what specific measures have been and will be implemented to comply with reclamation and <br />performance standards; and <br />3. plans for resumption of mining. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.