Laserfiche WebLink
• Appendix 7-6f.1, As-Built Report Sediment Pond 008 -insert the repaginated pages 7- <br />6£1-i through 7-6£1-10 behind new slip sheet appendix 7-6£1 <br />• Appendix 7-6E2, Pond 008 Emergency Spillway As-Built Report- insert new appendix <br />slip sheet <br />• Appendix 7-6f, Pond 008 Emergency Spillway Report As-Built -move this existing <br />appendix including Addendumm7-6fA, 7-6fB, and 7-6fC behind slip sheet for Appendix <br />7-6£2 <br />• Appendix 7-6f.3, Pond 008 Principal Spillway Replacement As-Built Report -insert new <br />appendix behind Appendix 7-6f.2 <br />• Appendix 7-6f.4, Sediment Pond 008 Permanent Impoundment Demonstration -insert <br />new appendix behind 7-6f.3 <br />• Appendix 7-6g, Permanent Impoundment PECOCO -replace page 7-6g-3 <br />• Appendix 7-6g.1, As-Built Report PECOCO Impoundment -insert new appendix behind <br />existing Appendix 7-6g <br />• Appendix 7-6i, As Built Report Truck Wash Ponds -insert new appendix behind existing <br />Appendix 7-6h <br />• Appendix 7-8, Seneca Coal Company Water Rights -replace existing slip sheet <br />• Appendix 7-8.1, Water Right Correspondence -insert behind new appendix behind <br />existing Appendix 7-8 <br />• Appendix 7-10, Impoundments and Monitoring Plan -replace page 7-10-14 <br />• Appendix 7-lOB -replace existing appendix <br />• Appendix 7-12.1, As-Built Report Drainage Channel SIIPM-1 -insert new appendix <br />behind existing Appendix 7-12. <br />Tab7, Hydrology, Vol. 6 <br />• List of Exhibits -replace existing list <br />• Exhibit 7-12A, Pond 004 Principal Spillway Replacement As-Built-insert new exhibit <br />behind existing Exhibit 7-12 <br />• Exhibit 7-166, Truck Wash Facilities As- Built- insert new exhibit <br />• Exhibit 7-17E, Pond 008 Principal Spillway Replacement As-Built -insert new exhibit <br />behind existing Exhibit 7-17E <br />• Exhibit 7-18A, PECOCO Impoundment As-Built -insert new exhibit behind existing <br />exhibit 7-18 <br />• Exhibit 7-20, Channel PM-2 Profile -replace existing channel profile <br />• Exhibit 7-20, Channel PM-3 Profile -replace existing channel profile <br />• Exhibit 7-2Q, Channel PM-4 Profile -replace existing channel profile <br />• Exhibit 7-20, Channel PM-5 Profile -replace existing channel profile <br />• Exhibit 7-20, Channel PM-7 Profile -replace existing channel profile <br />• Exhibit 7-20, Channel PM-10 Profile -replace existing channel profile <br />• Exhibit 7-20, Channel PM-13 Profile -replace existing channel profile <br />• Exhibit 7-2Q, Channel PM-16 Profile -replace existing channel profile <br />• Exhibit 7-2Q, Channel PM-19 Profile -replace existing channel profile <br />• Exhibit 7-2Q, Channel PM-20 Profile -replace existing channel profile <br />• Exhibit 7-2Q Channel PM-21 Profile -replace existing channel profile <br />• Exhibit 7-20, Channel PM-23 Profile -replace existing channel profile <br />• Exhibt 7-23, Channel SIIPM-1 Profile and Sections -insert new exhibit <br />Tab 12, Operation Plan, Vol. 10 <br />• Text-replace existing pages 12-32, 12-33, 12-51, 12-53a <br />