Laserfiche WebLink
- ~ iii iiiiiiiniii iii <br />STATE OF COLC~I~vv <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Nalu ral Re>ources <br />1317 Sherman 81 ,Room ? 15 Illj~~ <br />Denver, Colorado 80'03 I <br />Phone: 13031 866-7567 <br />FAX: 13071 83?-8106 <br />DEPARTMENT OF <br />NATURAL <br />RESOURCES <br />Roy Romer <br />Governor <br />DATE: July 25, 1997 lames S. LOChhead <br />EtecWwe Direao~ <br />Michael B Lonq <br />TO: Mike Boulay Drvlaon Dvecmr <br />FROM: Susan Burgmaier~ <br />RE: West Elk Mine (C-80-007) <br />Minor Revision No. 220 <br />1 have reviewed Mountain Coal Company~s (MCC) application for MR-22, and have the following <br />comments. <br />Revised Map 54 now includes revised topography at the Materials Storage Bench (MSB) and <br />Portal Bench Storage Area. The revised map does not include the proposed changes to ditch D2- <br />6C or culvert C2-3A. Please revise the map to include all proposed changes. <br />2. MCC, in the cover letter to MR-220, notes that the changes to the MSB configuration do not <br />warrant revisions to the ditch or culvert designs, but that D2-6C and C2-3A will be altered to <br />accommodate the bench expansion. Regardless of whether the structures would need to be <br />enlarged, MCC needs to revise the designs to ensure that information in the permit application <br />package is consistentwith on-the-groundconditions. Please revise the designs in accordancewith <br />the proposed changes. <br />One of the maps submitted by MCC is Map 58A, "Access Road Loop and Material Storage Area <br />Reclamation Plan". The currently approved permit application package includes a Map 58A <br />which is entitled "Sylvester Gulch Reclamation Plan". It does not seem appropriate to replace <br />the current map, as existing information would be lost. Please renumber and resubmit one of the <br />maps. <br />4. The newly submitted Map 58A does not show any reclamation at the west end of the MSB or the <br />east end of the Portal Bench Storage Area. Maps 53 and 54 show cuts and fills in these areas. <br />Please revise Map 58A to indicate that these areas will also be regraded to approximate original <br />contour. <br />MCC, in the revision cover letter, proposes to excavate approximately 16.000 CY of material to <br />reduce the MSB slope. MCC states further that the amount of material to be moved to reclaim <br />the MSB will increase by approximately 9,000 CY [t would appear that MCC is proposing to <br />