Laserfiche WebLink
IRCES Cost Estimating Software <br />Date : 15-Nov-2005 Permit orjob no.: M-1977-342 Site :Henderson Mine <br />User : ACS Abbreviation : none State :Colorado <br />Task : OOe Filename : M342-0Oe County :Grand <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Permit or job action :Operational and General Clarifications <br />Task description :Summary (Tasks 23a-286), orig. 7-2-02, revised 1-23-03 B 10-21-05, corrected 11-1F <br />s: ,:. <br />BASK LIST (DIRECT COSTS( FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br /> Lost Creek Reservoir Shores (Tasks 23a-23d) Never Constmcted <br /> <br />24a -Henderson 2000 Overiand Conveyor Structural DemolBion demolish 1 70.0 $501,087 <br />246 -Backfill 6 Grade along Conveyor Corridor (Henderson's estimate) NA 1 1.0 $62, 876 <br /> 24c, remove conveyor foundations from we8ands, eliminated thru clarifica ions <br />24d -Haul Ore Spilled /rom Conveyor to Tailing Pond tmckl 1 13.0 $1,274 <br /> 24e, cover demolished snow shed, now included in 24a, thru clar~ca8ons <br />24/ -Haul 8 Spread Topsoil (Henderson's es8mate) NA 1 1.0 $77,409 <br />24g -RevegetateConveyorComdor revege 1 30.0 $117,425 <br />24h -Trees 6 Shrubs (DMG 4-10-98 Estimate) revege 1 80.0 $102,087 <br /> <br />25a -Water Treatment (a~ Henderson Mine; 4 months (TR-12) NA 1 1.0 $146,667 <br />256 -Build Water Treatment Plant at Mill NA 1 1.0 $4,500,000 <br />25c -Water Treatment [~ Mill (8 yrs. (a3 $440/gpm @ 900 gpm), thru clarificati NA 1 1.0 $2,376,000 <br /> <br />26a -Mobllizafion/Demobillzation from Mine; Years 1-3 (TR-12) mobilize 1 35.5 $109,659 <br />266 -Mobiliza8or/Demoblliza8on from Mill SKe; Years 1-3 (TR-12) mobilize 1 42.0 $385,518 <br /> <br />27a -Dust Control (based on Climax Estimate) NA 1 100.0 $35, 000 <br /> <br />28a -Rill 8 Gully Maintenance (based on Climax EsBmate) NA 1 400.0 $31, 232 <br />28b -Road Maintenance (based on Climax Estimate) NA 1 480.0 $29.467 <br />SUBTOTALS :~ 1,255.5' $8,475,481 <br />