Laserfiche WebLink
11. Primary future (Post-mining) land use (check one): <br />_ Cropland(CR) _ Pastureland(PL) _ General Agriculture(GA) <br />X7C Rangeland(RL) _ Forestry(FR) _ Wildlife Habitat(WL) <br />Residential(RS) _ Recreation(RC) XX Industrial/Commercial(IC) <br />Developed Water Resources(WR) _ Solid Waste Disposal(WD) <br />12. Primary present Iand use (check one): <br />Cropland(CR) _ Pastureland(PL) _ General Agriculture(GA) <br />XR Rangeland(RL) J~ Forestry(FR) _ Wildlife Habitat(WL} <br />Residential(RS) Recreation(RC) XX Industrial/Commercial(IC) <br />Developed Water Resources(WR) <br />13. Method of Mining: _ Quarry (QR) _ Solution (SO) <br />13.1 Other: Briefly explain mining method (e.g. Placer, truck/shovel). <br />Underground. Amendment will not change methods. <br />14 . on site Processing: Milling. Amendment will not change processing methods. <br />Solution (SO) <br />Chemical (CH) <br />Thermal (TH) <br />Heap Leach (HL) <br />Vat Leach (VL) <br />List any designated chemicals or acid-producing materials to be used or stored withir <br />permit area: Amendment will not change chemicals or chemical usage from Permit. <br />Description of Amendment: <br />If you are amending or converting an existing operation, provide a brief narrative <br />describing the proposed change(s). <br />Amendmsnt to: 1) delete Area 23 - t ree - rom ermt acres acres a a <br />„ ,~ „ <br />to "industrial/commercial" on portions of the mine site, and from "open forest" to <br />"iudustriaUcommercial" or "developed water resources" at the tailing site. <br />