Laserfiche WebLink
-s- <br />ResAOnsibilities as a Permittee: <br />Upon application approval and permit issuance, this applicat on becomes a <br />legally binding document. Therefore, there are a number of mportant <br />requirements which you, as a permittee, should fully unders and. These <br />requirements are listed below. Please read and initial each requirement, in <br />the space provided, to acknowledge that you understand your bligations. If <br />you do not understand these obligations then please contact his Office for a <br />full explanation. <br />1. Your obligation to reclaim the site is not limited to the amount of <br />the financial warranty. You assume legal liability fo all reasonable <br />expenses which the Board or the Office may incur to re laim the affected <br />lands associated with your mining operation in the eve t your permit is <br />revoked and financial warranty is forfeited; <br />2. The Board may suspend or revoke this permit, or ass ss a civil <br />/Y penalty, upon a finding that the permittee violated th terms or <br />conditions of this permit, the Act, the Mineral Rules nd Regulations, <br />or that information contained in the application or yo r permit <br />misrepresent important material facts; <br />3. If your mining and reclamation operations affect ar~as beyond the <br />boundaries of an approved permit boundary, substantial civil penalties, <br />to you as permittee can result; <br />/1.1.~ 4. Any modification to the approved mining and reclama ion plan from <br />7~'~~ those described in your approved application requires ou to submit a <br />permit modification and obtain approval from the Board or Office; <br />5. It is your responsibility to notify the Office of a y changes in your <br />-~') address or phone number; <br />/1 L. 6. Upon permit issuance and prior to beginning on-site mining activity, <br />T"~~ you must post a sign at the entrance of the mine site, which shall be <br />clearly visible from the access road, with the followi g information <br />(Rule 3.1.12): <br />a. the name of the operator; <br />b. a statement that a reclamation permit for the op ration has been <br />issued by the Colorado Mined Land Reclamation Bo rd; and, <br />c. the permit number. <br />~__(~ 7. The boundaries of the permit boundary area must be arked by <br />T~~ monuments or other markers that are clearly visible an adequate to <br />delineate such boundaries prior to site disturbance. <br />