My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV90029
DRMS
>
Back File Migration
>
Revision
>
REV90029
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:11:50 AM
Creation date
11/21/2007 10:58:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985026
IBM Index Class Name
Revision
Doc Date
8/26/1998
Doc Name
CONSTRUCTION MATERIALS REGULAR 112 OPERATION
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />2. The operator shall comply with all applicable Federal and State water <br />and regulations; and <br />3. The operator shall comply with all Federal and State requirements for <br />and <br />4. The operator shall regrade all sediment in siltation structures after min <br />complete. <br />Groundwater -Specific Requirements <br />The operation will not affect groundwater quality on or off [he site. The <br />with State groundwater quality standazds. <br />In the wash plant, water will be recycled to a settling pond. Flocculen may be u: <br />the settling out of suspended solids. The flocculent will not cart[atn fl~dous or <br />The water recycled in the washing opera ion wi no ere ease mto any waterw <br />and silts salvaged from the washing operation may be used as fill material for the <br />Due to the absence of any pollutants, groundwater quality monitoring is not <br />operation. <br />Wi/d[ife <br />The proposed reclamation plan does not propose to create wildlife habitat. All a <br />planned considering the safety and protection of wildlife on the property. Some <br />temporarily displaced by the mining activities, but aze expected to re-establish v <br />after the reclamation <br />Topsoiling <br />uality laws <br />redge and fill; <br />ig is <br />will comply <br />d to assist in <br />~xic materials. <br />~s. The clays <br />lopes. <br />~d for this <br />hies will be <br />ties may be <br />no difficulty <br />The top six inches of soil is classified as topsoil. This layer includes the root zone of the grasses <br />and other plants. It will be stripped and stockpiled separately. By using concurre t reclamation <br />techniques, the topsoil in the stockpile should only remain for one to two yeazs. I the stockpile <br />remains more than one growing season, it will be seeded with wheatgrass to preve t erosion. <br />Topsoil will be replaced in reclaimed areas around the lakes in the same six-inch <br />Revegetation <br />The purpose of revegetation is to re-establish the pasture grasses and stabilize the ~ ewly <br />established soils. Slopes will be no greater than 3:1. The grasses were selected to be long lasting <br />and regenerate themselves. The ground will be fine grade an prepaze or see ~ g. e i izers <br />w~ e u rom the Natural Resources Conservat on Service. <br />/ l2 Amendment <br />Page 6 oJ23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.