<br />Your Mining Plan under "Geologic Uncertainties and Mine Plan keview" states that if extremely <br />adverse conditions are encountered, i[ may be necessary to begin the reclamation highwall slopes along <br />the north and central ridges near [he 600-foot setback from the existing property line. Please show your <br />Affected Land Boundary at the location of the maximum possible disturbances to avoid the possibility <br />of exceeding your permitted affected lands in the future. Your present Proposed New Mining Limit <br />(Affected Land Boundary) is at approximately a 400 fee[ setback from the existing property line. A 600 <br />feet setback could add as much as five plus, additional acres to the affected lands. This is significantly <br />more than the 13 acres proposed under the 400 feet setback. I[ would require an amendment [o add the <br />5 plus acres, in the future. <br />Exhibit E -Reclamation Plan <br />') d,rf~ <br />r~Gil I. You have stated that "native topsoil stockpile locations are shown on Exhibit C-1". These locations <br />p were not observed on that map. Please show them. <br />to -~ ~,( 2: ~ The Division of Wildlife recommends changes to [he proposed seed mix. A copy of their <br />tf $~~,~(k`~~) ~ recommendation is enclosed. The Division concurs with their recommendation. Please attempt to make <br />k,.) ~ "7 ~~ appropriate changes to [he reclamation seed mix. Contact David Lovell of [he DOW a[ (719) 227-5227 <br />r i' ~' e~ if you have any questions regarding his recommendation. <br />~~ I [t <br />Exhpibit L -Reclamation Costs <br />~: !7 1 JfYG Please include a cost for moving the backfill material [o [he benches prior to [he dozer work. Or, <br />(I ~,,~5 explain why this operation is not a separate cost item. <br />efi~ 1 `4~.), <br />e46~~2+ c° lease include cos[ figures for moving the topsoil from salvage stockpiles (not shown on plan maps) to <br />~~(, U~ [he benches prior to final application. It is assumed [hat your $1.00 per cu. yd. topsoil application figure <br />ptAt~~i is for spreading the topsoil after it is delivered to the bench. Also include costs for moving the donated <br />yydd'' j/ topsoil from the plant area to the benches. Or, explain why these costs are not separate cost items. <br />N11 '~ Please also add a cost for the State to purchase the donated fraction of the topsoil. The State would have <br />L 8, r,~ Ry4' ~0' no assurance that the community would donate the topsoil in the event that the state must complete <br />~~,, th•f ~ S ~ reclamation of the mine. The donated topsoil is not part of the Enhanced Reclamation Plan, which the ~ <br />•if ~4 [.~ pplicant is not guar~tye~ei ]will be impslemented. ~,~,f e G y~,~ ~ YQ ~~e <br />µk~"t ~ 'i 2r°, b~up~,~,-~~77.etcf o a(wl ~ F' ~~aK ~-.a-~b e ~~ ~Cu-.lt.r/ <br />i ,Z ~ a-Orc es.. k re o ~- ~ n <br />f 9 y4. Your vegetation plan map exhi tt F-2 shows that nearly all of 27 acres will be planted to trees. Your <br />inZ`~~~'~N reclamation narrative under Revegetation describes 30-100 trees per acre being planted. Please discuss <br />~ ~r why your reclamation cost figures are based on planting five acres at l00 trees per acre. If necessary, <br />~~ adjust figure F-2 to show the five acres where trees will be planted. <br />Exhibit N -Source of Legal Right to Enter <br />Please provide a copy of your U.S. Forest Service Special Use Permit for inclusion in your application. <br />That permit will document your legal right to access the amendment area to conduct mining operations. <br />If you will not have an approved Special Use Permit prior to the decision date, December 27, 2000, the <br />Division suggests that you either waive your right to a decision in 90 days or that you request a new <br />decision date that you are comfortable with, knowing that you will have secured legal right to enter. <br />Otherwise, the Division may deny your application on December 27, 2000, in accordance with CRS <br />34-32.5-I15 (4)(d). <br />