Laserfiche WebLink
.i <br />\ MOUNTAIN (OAL <br />~i''\~COMPANYLLC. <br />A Subsidiary of Arch Western Resources, I-1,C <br />West Elk Mine <br />P.O. Box 591 <br />5174 Highway 133 <br />Somerset, CO 81434 <br />(970) 929-5015 <br />Fax (970) 929-5595 <br />With Longwall Panel 17 scheduled to commence mining the latter part of Mazch 2003, MCC is <br />requesting as prompt and approval as possible. MCC has discussed the project with the USFS and <br />Chesnik Construction. Chesnik Construction believes the mild winter conditions could allow for the <br />road re-opening to take approximately one week. Subsequent mobilization to the site will take <br />approximately 5-7 days. Allowing a short time frame for approval by the USFS and CDMG, MCC <br />would anticipate the project to commence immediately after the 10-day comment period. The schedule <br />is aggressive to help avoid spring thaw and problems associated with the thaw. We expect <br />demobilization to occur as eazly as March 21, 2003. <br />Please notify me if you have questions regazding this minor revision request. <br />Si , <br />G~.~~- <br />Henry A. be <br />Environmental Engineer <br />Enclosures: <br />cc: P. Schmidt <br />W. Koontz <br />M. Peacock <br />D. Nolte <br />ComgMR291rev.doc <br />