Laserfiche WebLink
m <br />0 <br />DO D� <br />6gAQ <br />�O <br />ba <br />6y <br />66 �O <br />0 <br />w. <br />FINAL RECLAMA'T'ION <br />�I TOPSOIL STOCKPILE Y \, I - <br />46,750 CU. YD. CAP.. (USED TO COMPLETE RECLAMATION OF PHASE Ill) - <br />SEMI- PORTABLE TRUC SCALES <br />� Toe of Outcrop � ' � - �" ^\ � // // / (REMOVED AT FINAL R CLAMA LION) I <br />PHASE III IO <br />�IADVANCING HIGHWALL AND SIDEWALLS \ \ \\ PH AST. I I <br />/i WILL BE EXCAVATED NEARLY VERTICAL <br />7 DURING DEVELOPMENT BOTH THE <br />/ HIGHWALL AND SIDEWALLS SLOPES \ \ <br />L I T) WILL BE REDUCED FROM THE \ \ - — — — / <br />DISTURBANCE BOUNDARY TO THE PIT <br />I FL OOR TO 4 TO 1 .SLOPES BEFORE <br />II COVERFILL MATERIAL lS APPLIED. <br />INITIAL MINING AND FACIL177ES AREA - PHASE Ill <br />(USED 70 COMPLETE RECLAMATION OF P ASE 11) <br />11 S� IIo, <br />�I 6s2D <br />0a1. <br />I I <br />iI _ _ _ <br />9D 3�U v \- - --- <br />4 I( \ \ <br />I I \ 1 <br />PERMIT BDUNDAR Y �� — — — — — — , <br />RECLAMATION SEQUENCE I - - CULVERT DETAILS <br />1. MINING AND RECL FC <br />AMA WILL Bf BEGIN IN PHASE l BY STRIPPING 5560 J. 72" X 20' <br />1 12 X 20 <br />I FND 2. 12" X 20' 1 <br />AVAILABLE COVERFILL MATERIAL FROM "AREA OF INITIAL DEVELOPMENT" \ \ <br />AND AN AREA NEAR THE CENTER OF PHASE ! THIS MATERIAL WILL AT - 4. 12" X 20' CULVERT DETAILS <br />I - \ \ <br />FIRST BE PUSHED UP AND PILED AROUND THE PERIMETER OF THE PHASE I ... \\ \ I <br />PIT DISTURBANCE BOUNDARY -- � -- �,. \ 1 1E" X 40' <br />I AREA, TO CREATE AN AREA OF SUFFICIENT SIZE FOR THE INSTALLATION -- I <br />OF THE CRUSHING AND SCREENING PLANT. AS THE "AREA OF INITIAL 6540 - \ 2. 12" X 40' I <br />DEVELOPMENT l5 MINED, THE PLANT WILL BE MOVED INTO THE PIT. AS I -- ROAD DISTURBANCE BOUNDARY 65 - -_` \.� I 4. 16" X 60' <br />THE PIT AND PLANT ADVANCES, THE PUSHED UP TOPSOIL MATERIAL IMLL — — — PERMIT BOUNDARY �'� <br />BE TRANSFERRED TO A LONG STOCKPILE AREA ALONG THE SOUTH SIDE <br />OF THE GURLE Y DITCH, NORTH OF THE PHASE I MINING AREA. THIS FILL I <br />AREA CAN STORE ABOUT 4,000 CU.YDS OF MATERIAL WHICH 15 ABOUT I POWERLINE <br />EQUAL <br />To THE VOLUME OF MATERIAL COVERING THE 5 ACRES OF <br />DISTURBANCE NEEDED FOR INITIAL MINING AND FACILITIES. THE UNPA I7EO ROAD <br />REMAINING TOPSOIL WILL BE STORED 1N THE SOUTHEAST CORNER OF THE <br />PIT. (SEE MAP C2 - OPERATION PLAN.) PA. VED ROAD <br />2. AFTER THE CONSTRUCTION OF THE TOPSOIL STOCKPILE, TOPSOIL WILL <br />CUT. INERT <br />BE STRIPPED IN ADVANCE OF GRAVEL EXTRACTION AND THEN LIVE - <br />HAULED TO THE PIT FLOOR, WHERE IT WILL BE SPREAD ALONG THE PIT IRLE LINT. I I - \ \ <br />FLOOR, THE BERM ALONG THE SOUTHERN PIT EXPOSURE AND THE SIDE / /j.\ I <br />SLOPES. THE MATERIAL WILL BE SPREAD TO THE THICKNESS AT WHICH �--�� I \~ \ \\ <br />T was REMOVED. - -� NATURITA CRECK <br />J. AS THE PIT NEARS FINAL MINING AND ALL TOPSOIL FROM THE I MINOR DRAINAGE <br />PHASE I PIT HAS BEEN PLACED BEHIND THE FINISHING PIT TOPSOIL - -- - IRRIGATION CANAL \ <br />MATERIAL FROM THE "INITIAL FACIOTES - PHASE I/" WILL BE STRIPPED <br />AND PLACED IN THE PHASE I AREA TO COMPLETE THE RECLAMATION OF - FENCE <br />THE PIT. w <br />�> POND <br />4. AS MINING BEGINS IN PHASE ll, TOPSOIL MATERIAL WILL BE STRIPPED <br />AND PLACED ON THE "INITIAL MINING AND FACILITIES AREA - PHASE 1." I I I \ \ <br />THIS MATE RIAI WILL COMPLETE THE RECLAMATION OF PHASE I. ■ RESIDENCE Z I \� \,\� \�� I APPROXIMATE INITIAL <br />i ' \ `_ q �` \ \. \ TOPSOIL STOCKPILE <br />P <br />PHASE E \ \ 4,000 CU. YD. CAP. <br />5 AS MINING PROGRESSES THROUGH PHASE ll, TOPSOIL MATERIAL WILL OUTBUILDING I / I \� \ \, �.� / ` 4,000 NEEDED ' <br />AGAIN BE STRIPPED IN ADVANCE, LIVE HAULED TO THE EXPOSED PIT, _ /\ <br />AND SPREAD ON SLOPES AND FLOOR AS IN PHASE 1. AT THIS POINT, A n 145 <br />STATE HIGHWAY DESIGNATION <br />145. <br />0 <br />m <br />m <br />-6590 - -- <br />'JUN 15 20M <br />FINAL RECLAMATION TOPSOIL STOCKPILE WILL BE CREATED, USING I \ Division of Minerals and Geology <br />EXCESS TOPSOIL TO BUILD A STOCKPILE IN THE NORTHWEST CORNER OF <br />THE PHASE U PIT WHICH CAN HOLD UP TO 46,750 CU. 1D5. �O.F <br />INITIAL MINING AND \ i� <br />6. AS MINING NEARS COMPLETION_ IN PHASE /L TAP-SOIL- WATjRIAL_WILL - <br />I ACII.ITIES AREA -PHASE \ <br />BE STRIPPED FROM 6.2 ACRES OF THE PHASE !ll PIT AND USED TO - - - - - - - _ _ _ _ - - - - - - - _ - ,� <br />COVER THE REMAINING PIT DISTURBANCE AND THE PHASE 11 FACILITIES -- - - -- _ - / ' I� \ \ <br />- - - - - -- - - - � I DENVER <br />AREA. ANY EXCESS MATERIAL WILL BE STOCKPILED ON THE FINAL <br />TOPSOIL MATERIAL STOCKPILE. <br />7 THE EXPOSED AREA REMAINING AT THE END OF PHASE 1/I WILL BE <br />RECLAIMED AFTER THE COMPLETION OF MINING USING THE MATERIAL <br />STOCKPILED IN THE FINAL. RECLAMATION TOPSOIL STOCKPILE AREA. <br />Ariol Photography and contours provided by Data /LJUpping, Grand Junction Colorado <br />LOUISIANA LAND AND GRAVEL COMPANY, LLC <br />P.O. BOX 8419 <br />CLINTON, LA 70722 <br />.1. E. STOVER & ASSOCIATES <br />210, Compass Dr.. Suite 101 <br />Grand 10_, ('0 01900 <br />1\ <br />N \ \" JUN 1 3 2003 <br />OFFIICE <br />.r — <br />_ a'nd Jmft4fw . a Of�oo <br />Dirsion of R9inernt�0 <br />\� ; <br />Permit #: 41 -,700o -O q Confidental ?: x,/ <br />Class: Retylsion Type -Seq.: <br />From: Mt =. S4ojc7 d- sloe To: / piLt G <br />{� Doc. Name: �C, _ F -,foyc fa Tra�1 P1e,7 ed,90 <br />S \ Doc. Date (if no date stamp): Lo- /3 - J9 { <br />N <br />wE <br />S <br />Designed By, <br />Drawn By <br />CNec4 <ed Byt <br />-?E� /S/ONS LOUISIANA LAND & GRAVEL COMPANY, LLC <br />1 GIVE INCH <br />7 <br />D.A J <br />J. <br />D.A.✓. <br />D.A.J. <br />% 03 <br />04107 <br />03101 <br />RECLAMATION PLAN <br />3. <br />REV P'HASE07 PIT e& PERM BOUND <br />REVISED ROAD ALIGNMENT <br />2. <br />I <br />DWG NAME: <br />EXHIBIT F <br />D.A.J. <br />3 2000 <br />1. <br />N0. <br />REVISED PHASE SEQUENCE AND ROAD <br />SCALE: <br />1 = 200 <br />REVISION <br />BY <br />DATE <br />m <br />0 <br />DO D� <br />6gAQ <br />�O <br />ba <br />6y <br />66 �O <br />0 <br />w. <br />FINAL RECLAMA'T'ION <br />�I TOPSOIL STOCKPILE Y \, I - <br />46,750 CU. YD. CAP.. (USED TO COMPLETE RECLAMATION OF PHASE Ill) - <br />SEMI- PORTABLE TRUC SCALES <br />� Toe of Outcrop � ' � - �" ^\ � // // / (REMOVED AT FINAL R CLAMA LION) I <br />PHASE III IO <br />�IADVANCING HIGHWALL AND SIDEWALLS \ \ \\ PH AST. I I <br />/i WILL BE EXCAVATED NEARLY VERTICAL <br />7 DURING DEVELOPMENT BOTH THE <br />/ HIGHWALL AND SIDEWALLS SLOPES \ \ <br />L I T) WILL BE REDUCED FROM THE \ \ - — — — / <br />DISTURBANCE BOUNDARY TO THE PIT <br />I FL OOR TO 4 TO 1 .SLOPES BEFORE <br />II COVERFILL MATERIAL lS APPLIED. <br />INITIAL MINING AND FACIL177ES AREA - PHASE Ill <br />(USED 70 COMPLETE RECLAMATION OF P ASE 11) <br />11 S� IIo, <br />�I 6s2D <br />0a1. <br />I I <br />iI _ _ _ <br />9D 3�U v \- - --- <br />4 I( \ \ <br />I I \ 1 <br />PERMIT BDUNDAR Y �� — — — — — — , <br />RECLAMATION SEQUENCE I - - CULVERT DETAILS <br />1. MINING AND RECL FC <br />AMA WILL Bf BEGIN IN PHASE l BY STRIPPING 5560 J. 72" X 20' <br />1 12 X 20 <br />I FND 2. 12" X 20' 1 <br />AVAILABLE COVERFILL MATERIAL FROM "AREA OF INITIAL DEVELOPMENT" \ \ <br />AND AN AREA NEAR THE CENTER OF PHASE ! THIS MATERIAL WILL AT - 4. 12" X 20' CULVERT DETAILS <br />I - \ \ <br />FIRST BE PUSHED UP AND PILED AROUND THE PERIMETER OF THE PHASE I ... \\ \ I <br />PIT DISTURBANCE BOUNDARY -- � -- �,. \ 1 1E" X 40' <br />I AREA, TO CREATE AN AREA OF SUFFICIENT SIZE FOR THE INSTALLATION -- I <br />OF THE CRUSHING AND SCREENING PLANT. AS THE "AREA OF INITIAL 6540 - \ 2. 12" X 40' I <br />DEVELOPMENT l5 MINED, THE PLANT WILL BE MOVED INTO THE PIT. AS I -- ROAD DISTURBANCE BOUNDARY 65 - -_` \.� I 4. 16" X 60' <br />THE PIT AND PLANT ADVANCES, THE PUSHED UP TOPSOIL MATERIAL IMLL — — — PERMIT BOUNDARY �'� <br />BE TRANSFERRED TO A LONG STOCKPILE AREA ALONG THE SOUTH SIDE <br />OF THE GURLE Y DITCH, NORTH OF THE PHASE I MINING AREA. THIS FILL I <br />AREA CAN STORE ABOUT 4,000 CU.YDS OF MATERIAL WHICH 15 ABOUT I POWERLINE <br />EQUAL <br />To THE VOLUME OF MATERIAL COVERING THE 5 ACRES OF <br />DISTURBANCE NEEDED FOR INITIAL MINING AND FACILITIES. THE UNPA I7EO ROAD <br />REMAINING TOPSOIL WILL BE STORED 1N THE SOUTHEAST CORNER OF THE <br />PIT. (SEE MAP C2 - OPERATION PLAN.) PA. VED ROAD <br />2. AFTER THE CONSTRUCTION OF THE TOPSOIL STOCKPILE, TOPSOIL WILL <br />CUT. INERT <br />BE STRIPPED IN ADVANCE OF GRAVEL EXTRACTION AND THEN LIVE - <br />HAULED TO THE PIT FLOOR, WHERE IT WILL BE SPREAD ALONG THE PIT IRLE LINT. I I - \ \ <br />FLOOR, THE BERM ALONG THE SOUTHERN PIT EXPOSURE AND THE SIDE / /j.\ I <br />SLOPES. THE MATERIAL WILL BE SPREAD TO THE THICKNESS AT WHICH �--�� I \~ \ \\ <br />T was REMOVED. - -� NATURITA CRECK <br />J. AS THE PIT NEARS FINAL MINING AND ALL TOPSOIL FROM THE I MINOR DRAINAGE <br />PHASE I PIT HAS BEEN PLACED BEHIND THE FINISHING PIT TOPSOIL - -- - IRRIGATION CANAL \ <br />MATERIAL FROM THE "INITIAL FACIOTES - PHASE I/" WILL BE STRIPPED <br />AND PLACED IN THE PHASE I AREA TO COMPLETE THE RECLAMATION OF - FENCE <br />THE PIT. w <br />�> POND <br />4. AS MINING BEGINS IN PHASE ll, TOPSOIL MATERIAL WILL BE STRIPPED <br />AND PLACED ON THE "INITIAL MINING AND FACILITIES AREA - PHASE 1." I I I \ \ <br />THIS MATE RIAI WILL COMPLETE THE RECLAMATION OF PHASE I. ■ RESIDENCE Z I \� \,\� \�� I APPROXIMATE INITIAL <br />i ' \ `_ q �` \ \. \ TOPSOIL STOCKPILE <br />P <br />PHASE E \ \ 4,000 CU. YD. CAP. <br />5 AS MINING PROGRESSES THROUGH PHASE ll, TOPSOIL MATERIAL WILL OUTBUILDING I / I \� \ \, �.� / ` 4,000 NEEDED ' <br />AGAIN BE STRIPPED IN ADVANCE, LIVE HAULED TO THE EXPOSED PIT, _ /\ <br />AND SPREAD ON SLOPES AND FLOOR AS IN PHASE 1. AT THIS POINT, A n 145 <br />STATE HIGHWAY DESIGNATION <br />145. <br />0 <br />m <br />m <br />-6590 - -- <br />'JUN 15 20M <br />FINAL RECLAMATION TOPSOIL STOCKPILE WILL BE CREATED, USING I \ Division of Minerals and Geology <br />EXCESS TOPSOIL TO BUILD A STOCKPILE IN THE NORTHWEST CORNER OF <br />THE PHASE U PIT WHICH CAN HOLD UP TO 46,750 CU. 1D5. �O.F <br />INITIAL MINING AND \ i� <br />6. AS MINING NEARS COMPLETION_ IN PHASE /L TAP-SOIL- WATjRIAL_WILL - <br />I ACII.ITIES AREA -PHASE \ <br />BE STRIPPED FROM 6.2 ACRES OF THE PHASE !ll PIT AND USED TO - - - - - - - _ _ _ _ - - - - - - - _ - ,� <br />COVER THE REMAINING PIT DISTURBANCE AND THE PHASE 11 FACILITIES -- - - -- _ - / ' I� \ \ <br />- - - - - -- - - - � I DENVER <br />AREA. ANY EXCESS MATERIAL WILL BE STOCKPILED ON THE FINAL <br />TOPSOIL MATERIAL STOCKPILE. <br />7 THE EXPOSED AREA REMAINING AT THE END OF PHASE 1/I WILL BE <br />RECLAIMED AFTER THE COMPLETION OF MINING USING THE MATERIAL <br />STOCKPILED IN THE FINAL. RECLAMATION TOPSOIL STOCKPILE AREA. <br />Ariol Photography and contours provided by Data /LJUpping, Grand Junction Colorado <br />LOUISIANA LAND AND GRAVEL COMPANY, LLC <br />P.O. BOX 8419 <br />CLINTON, LA 70722 <br />.1. E. STOVER & ASSOCIATES <br />210, Compass Dr.. Suite 101 <br />Grand 10_, ('0 01900 <br />1\ <br />N \ \" JUN 1 3 2003 <br />OFFIICE <br />.r — <br />_ a'nd Jmft4fw . a Of�oo <br />Dirsion of R9inernt�0 <br />\� ; <br />Permit #: 41 -,700o -O q Confidental ?: x,/ <br />Class: Retylsion Type -Seq.: <br />From: Mt =. S4ojc7 d- sloe To: / piLt G <br />{� Doc. Name: �C, _ F -,foyc fa Tra�1 P1e,7 ed,90 <br />S \ Doc. Date (if no date stamp): Lo- /3 - J9 { <br />N <br />wE <br />S <br />Designed By, <br />Drawn By <br />CNec4 <ed Byt <br />-?E� /S/ONS LOUISIANA LAND & GRAVEL COMPANY, LLC <br />1 GIVE INCH <br />7 <br />D.A J <br />J. <br />D.A.✓. <br />D.A.J. <br />% 03 <br />04107 <br />03101 <br />RECLAMATION PLAN <br />3. <br />REV P'HASE07 PIT e& PERM BOUND <br />REVISED ROAD ALIGNMENT <br />2. <br />DMG FILE NUMBER: M - 2000 - 049 <br />DWG NAME: <br />EXHIBIT F <br />D.A.J. <br />3 2000 <br />1. <br />N0. <br />REVISED PHASE SEQUENCE AND ROAD <br />SCALE: <br />1 = 200 <br />REVISION <br />BY <br />DATE <br />i <br />I . <br />�iL <br />