m
<br />0
<br />DO D�
<br />6gAQ
<br />�O
<br />ba
<br />6y
<br />66 �O
<br />0
<br />w.
<br />FINAL RECLAMA'T'ION
<br />�I TOPSOIL STOCKPILE Y \, I -
<br />46,750 CU. YD. CAP.. (USED TO COMPLETE RECLAMATION OF PHASE Ill) -
<br />SEMI- PORTABLE TRUC SCALES
<br />� Toe of Outcrop � ' � - �" ^\ � // // / (REMOVED AT FINAL R CLAMA LION) I
<br />PHASE III IO
<br />�IADVANCING HIGHWALL AND SIDEWALLS \ \ \\ PH AST. I I
<br />/i WILL BE EXCAVATED NEARLY VERTICAL
<br />7 DURING DEVELOPMENT BOTH THE
<br />/ HIGHWALL AND SIDEWALLS SLOPES \ \
<br />L I T) WILL BE REDUCED FROM THE \ \ - — — — /
<br />DISTURBANCE BOUNDARY TO THE PIT
<br />I FL OOR TO 4 TO 1 .SLOPES BEFORE
<br />II COVERFILL MATERIAL lS APPLIED.
<br />INITIAL MINING AND FACIL177ES AREA - PHASE Ill
<br />(USED 70 COMPLETE RECLAMATION OF P ASE 11)
<br />11 S� IIo,
<br />�I 6s2D
<br />0a1.
<br />I I
<br />iI _ _ _
<br />9D 3�U v \- - ---
<br />4 I( \ \
<br />I I \ 1
<br />PERMIT BDUNDAR Y �� — — — — — — ,
<br />RECLAMATION SEQUENCE I - - CULVERT DETAILS
<br />1. MINING AND RECL FC
<br />AMA WILL Bf BEGIN IN PHASE l BY STRIPPING 5560 J. 72" X 20'
<br />1 12 X 20
<br />I FND 2. 12" X 20' 1
<br />AVAILABLE COVERFILL MATERIAL FROM "AREA OF INITIAL DEVELOPMENT" \ \
<br />AND AN AREA NEAR THE CENTER OF PHASE ! THIS MATERIAL WILL AT - 4. 12" X 20' CULVERT DETAILS
<br />I - \ \
<br />FIRST BE PUSHED UP AND PILED AROUND THE PERIMETER OF THE PHASE I ... \\ \ I
<br />PIT DISTURBANCE BOUNDARY -- � -- �,. \ 1 1E" X 40'
<br />I AREA, TO CREATE AN AREA OF SUFFICIENT SIZE FOR THE INSTALLATION -- I
<br />OF THE CRUSHING AND SCREENING PLANT. AS THE "AREA OF INITIAL 6540 - \ 2. 12" X 40' I
<br />DEVELOPMENT l5 MINED, THE PLANT WILL BE MOVED INTO THE PIT. AS I -- ROAD DISTURBANCE BOUNDARY 65 - -_` \.� I 4. 16" X 60'
<br />THE PIT AND PLANT ADVANCES, THE PUSHED UP TOPSOIL MATERIAL IMLL — — — PERMIT BOUNDARY �'�
<br />BE TRANSFERRED TO A LONG STOCKPILE AREA ALONG THE SOUTH SIDE
<br />OF THE GURLE Y DITCH, NORTH OF THE PHASE I MINING AREA. THIS FILL I
<br />AREA CAN STORE ABOUT 4,000 CU.YDS OF MATERIAL WHICH 15 ABOUT I POWERLINE
<br />EQUAL
<br />To THE VOLUME OF MATERIAL COVERING THE 5 ACRES OF
<br />DISTURBANCE NEEDED FOR INITIAL MINING AND FACILITIES. THE UNPA I7EO ROAD
<br />REMAINING TOPSOIL WILL BE STORED 1N THE SOUTHEAST CORNER OF THE
<br />PIT. (SEE MAP C2 - OPERATION PLAN.) PA. VED ROAD
<br />2. AFTER THE CONSTRUCTION OF THE TOPSOIL STOCKPILE, TOPSOIL WILL
<br />CUT. INERT
<br />BE STRIPPED IN ADVANCE OF GRAVEL EXTRACTION AND THEN LIVE -
<br />HAULED TO THE PIT FLOOR, WHERE IT WILL BE SPREAD ALONG THE PIT IRLE LINT. I I - \ \
<br />FLOOR, THE BERM ALONG THE SOUTHERN PIT EXPOSURE AND THE SIDE / /j.\ I
<br />SLOPES. THE MATERIAL WILL BE SPREAD TO THE THICKNESS AT WHICH �--�� I \~ \ \\
<br />T was REMOVED. - -� NATURITA CRECK
<br />J. AS THE PIT NEARS FINAL MINING AND ALL TOPSOIL FROM THE I MINOR DRAINAGE
<br />PHASE I PIT HAS BEEN PLACED BEHIND THE FINISHING PIT TOPSOIL - -- - IRRIGATION CANAL \
<br />MATERIAL FROM THE "INITIAL FACIOTES - PHASE I/" WILL BE STRIPPED
<br />AND PLACED IN THE PHASE I AREA TO COMPLETE THE RECLAMATION OF - FENCE
<br />THE PIT. w
<br />�> POND
<br />4. AS MINING BEGINS IN PHASE ll, TOPSOIL MATERIAL WILL BE STRIPPED
<br />AND PLACED ON THE "INITIAL MINING AND FACILITIES AREA - PHASE 1." I I I \ \
<br />THIS MATE RIAI WILL COMPLETE THE RECLAMATION OF PHASE I. ■ RESIDENCE Z I \� \,\� \�� I APPROXIMATE INITIAL
<br />i ' \ `_ q �` \ \. \ TOPSOIL STOCKPILE
<br />P
<br />PHASE E \ \ 4,000 CU. YD. CAP.
<br />5 AS MINING PROGRESSES THROUGH PHASE ll, TOPSOIL MATERIAL WILL OUTBUILDING I / I \� \ \, �.� / ` 4,000 NEEDED '
<br />AGAIN BE STRIPPED IN ADVANCE, LIVE HAULED TO THE EXPOSED PIT, _ /\
<br />AND SPREAD ON SLOPES AND FLOOR AS IN PHASE 1. AT THIS POINT, A n 145
<br />STATE HIGHWAY DESIGNATION
<br />145.
<br />0
<br />m
<br />m
<br />-6590 - --
<br />'JUN 15 20M
<br />FINAL RECLAMATION TOPSOIL STOCKPILE WILL BE CREATED, USING I \ Division of Minerals and Geology
<br />EXCESS TOPSOIL TO BUILD A STOCKPILE IN THE NORTHWEST CORNER OF
<br />THE PHASE U PIT WHICH CAN HOLD UP TO 46,750 CU. 1D5. �O.F
<br />INITIAL MINING AND \ i�
<br />6. AS MINING NEARS COMPLETION_ IN PHASE /L TAP-SOIL- WATjRIAL_WILL -
<br />I ACII.ITIES AREA -PHASE \
<br />BE STRIPPED FROM 6.2 ACRES OF THE PHASE !ll PIT AND USED TO - - - - - - - _ _ _ _ - - - - - - - _ - ,�
<br />COVER THE REMAINING PIT DISTURBANCE AND THE PHASE 11 FACILITIES -- - - -- _ - / ' I� \ \
<br />- - - - - -- - - - � I DENVER
<br />AREA. ANY EXCESS MATERIAL WILL BE STOCKPILED ON THE FINAL
<br />TOPSOIL MATERIAL STOCKPILE.
<br />7 THE EXPOSED AREA REMAINING AT THE END OF PHASE 1/I WILL BE
<br />RECLAIMED AFTER THE COMPLETION OF MINING USING THE MATERIAL
<br />STOCKPILED IN THE FINAL. RECLAMATION TOPSOIL STOCKPILE AREA.
<br />Ariol Photography and contours provided by Data /LJUpping, Grand Junction Colorado
<br />LOUISIANA LAND AND GRAVEL COMPANY, LLC
<br />P.O. BOX 8419
<br />CLINTON, LA 70722
<br />.1. E. STOVER & ASSOCIATES
<br />210, Compass Dr.. Suite 101
<br />Grand 10_, ('0 01900
<br />1\
<br />N \ \" JUN 1 3 2003
<br />OFFIICE
<br />.r —
<br />_ a'nd Jmft4fw . a Of�oo
<br />Dirsion of R9inernt�0
<br />\� ;
<br />Permit #: 41 -,700o -O q Confidental ?: x,/
<br />Class: Retylsion Type -Seq.:
<br />From: Mt =. S4ojc7 d- sloe To: / piLt G
<br />{� Doc. Name: �C, _ F -,foyc fa Tra�1 P1e,7 ed,90
<br />S \ Doc. Date (if no date stamp): Lo- /3 - J9 {
<br />N
<br />wE
<br />S
<br />Designed By,
<br />Drawn By
<br />CNec4 <ed Byt
<br />-?E� /S/ONS LOUISIANA LAND & GRAVEL COMPANY, LLC
<br />1 GIVE INCH
<br />7
<br />D.A J
<br />J.
<br />D.A.✓.
<br />D.A.J.
<br />% 03
<br />04107
<br />03101
<br />RECLAMATION PLAN
<br />3.
<br />REV P'HASE07 PIT e& PERM BOUND
<br />REVISED ROAD ALIGNMENT
<br />2.
<br />I
<br />DWG NAME:
<br />EXHIBIT F
<br />D.A.J.
<br />3 2000
<br />1.
<br />N0.
<br />REVISED PHASE SEQUENCE AND ROAD
<br />SCALE:
<br />1 = 200
<br />REVISION
<br />BY
<br />DATE
<br />m
<br />0
<br />DO D�
<br />6gAQ
<br />�O
<br />ba
<br />6y
<br />66 �O
<br />0
<br />w.
<br />FINAL RECLAMA'T'ION
<br />�I TOPSOIL STOCKPILE Y \, I -
<br />46,750 CU. YD. CAP.. (USED TO COMPLETE RECLAMATION OF PHASE Ill) -
<br />SEMI- PORTABLE TRUC SCALES
<br />� Toe of Outcrop � ' � - �" ^\ � // // / (REMOVED AT FINAL R CLAMA LION) I
<br />PHASE III IO
<br />�IADVANCING HIGHWALL AND SIDEWALLS \ \ \\ PH AST. I I
<br />/i WILL BE EXCAVATED NEARLY VERTICAL
<br />7 DURING DEVELOPMENT BOTH THE
<br />/ HIGHWALL AND SIDEWALLS SLOPES \ \
<br />L I T) WILL BE REDUCED FROM THE \ \ - — — — /
<br />DISTURBANCE BOUNDARY TO THE PIT
<br />I FL OOR TO 4 TO 1 .SLOPES BEFORE
<br />II COVERFILL MATERIAL lS APPLIED.
<br />INITIAL MINING AND FACIL177ES AREA - PHASE Ill
<br />(USED 70 COMPLETE RECLAMATION OF P ASE 11)
<br />11 S� IIo,
<br />�I 6s2D
<br />0a1.
<br />I I
<br />iI _ _ _
<br />9D 3�U v \- - ---
<br />4 I( \ \
<br />I I \ 1
<br />PERMIT BDUNDAR Y �� — — — — — — ,
<br />RECLAMATION SEQUENCE I - - CULVERT DETAILS
<br />1. MINING AND RECL FC
<br />AMA WILL Bf BEGIN IN PHASE l BY STRIPPING 5560 J. 72" X 20'
<br />1 12 X 20
<br />I FND 2. 12" X 20' 1
<br />AVAILABLE COVERFILL MATERIAL FROM "AREA OF INITIAL DEVELOPMENT" \ \
<br />AND AN AREA NEAR THE CENTER OF PHASE ! THIS MATERIAL WILL AT - 4. 12" X 20' CULVERT DETAILS
<br />I - \ \
<br />FIRST BE PUSHED UP AND PILED AROUND THE PERIMETER OF THE PHASE I ... \\ \ I
<br />PIT DISTURBANCE BOUNDARY -- � -- �,. \ 1 1E" X 40'
<br />I AREA, TO CREATE AN AREA OF SUFFICIENT SIZE FOR THE INSTALLATION -- I
<br />OF THE CRUSHING AND SCREENING PLANT. AS THE "AREA OF INITIAL 6540 - \ 2. 12" X 40' I
<br />DEVELOPMENT l5 MINED, THE PLANT WILL BE MOVED INTO THE PIT. AS I -- ROAD DISTURBANCE BOUNDARY 65 - -_` \.� I 4. 16" X 60'
<br />THE PIT AND PLANT ADVANCES, THE PUSHED UP TOPSOIL MATERIAL IMLL — — — PERMIT BOUNDARY �'�
<br />BE TRANSFERRED TO A LONG STOCKPILE AREA ALONG THE SOUTH SIDE
<br />OF THE GURLE Y DITCH, NORTH OF THE PHASE I MINING AREA. THIS FILL I
<br />AREA CAN STORE ABOUT 4,000 CU.YDS OF MATERIAL WHICH 15 ABOUT I POWERLINE
<br />EQUAL
<br />To THE VOLUME OF MATERIAL COVERING THE 5 ACRES OF
<br />DISTURBANCE NEEDED FOR INITIAL MINING AND FACILITIES. THE UNPA I7EO ROAD
<br />REMAINING TOPSOIL WILL BE STORED 1N THE SOUTHEAST CORNER OF THE
<br />PIT. (SEE MAP C2 - OPERATION PLAN.) PA. VED ROAD
<br />2. AFTER THE CONSTRUCTION OF THE TOPSOIL STOCKPILE, TOPSOIL WILL
<br />CUT. INERT
<br />BE STRIPPED IN ADVANCE OF GRAVEL EXTRACTION AND THEN LIVE -
<br />HAULED TO THE PIT FLOOR, WHERE IT WILL BE SPREAD ALONG THE PIT IRLE LINT. I I - \ \
<br />FLOOR, THE BERM ALONG THE SOUTHERN PIT EXPOSURE AND THE SIDE / /j.\ I
<br />SLOPES. THE MATERIAL WILL BE SPREAD TO THE THICKNESS AT WHICH �--�� I \~ \ \\
<br />T was REMOVED. - -� NATURITA CRECK
<br />J. AS THE PIT NEARS FINAL MINING AND ALL TOPSOIL FROM THE I MINOR DRAINAGE
<br />PHASE I PIT HAS BEEN PLACED BEHIND THE FINISHING PIT TOPSOIL - -- - IRRIGATION CANAL \
<br />MATERIAL FROM THE "INITIAL FACIOTES - PHASE I/" WILL BE STRIPPED
<br />AND PLACED IN THE PHASE I AREA TO COMPLETE THE RECLAMATION OF - FENCE
<br />THE PIT. w
<br />�> POND
<br />4. AS MINING BEGINS IN PHASE ll, TOPSOIL MATERIAL WILL BE STRIPPED
<br />AND PLACED ON THE "INITIAL MINING AND FACILITIES AREA - PHASE 1." I I I \ \
<br />THIS MATE RIAI WILL COMPLETE THE RECLAMATION OF PHASE I. ■ RESIDENCE Z I \� \,\� \�� I APPROXIMATE INITIAL
<br />i ' \ `_ q �` \ \. \ TOPSOIL STOCKPILE
<br />P
<br />PHASE E \ \ 4,000 CU. YD. CAP.
<br />5 AS MINING PROGRESSES THROUGH PHASE ll, TOPSOIL MATERIAL WILL OUTBUILDING I / I \� \ \, �.� / ` 4,000 NEEDED '
<br />AGAIN BE STRIPPED IN ADVANCE, LIVE HAULED TO THE EXPOSED PIT, _ /\
<br />AND SPREAD ON SLOPES AND FLOOR AS IN PHASE 1. AT THIS POINT, A n 145
<br />STATE HIGHWAY DESIGNATION
<br />145.
<br />0
<br />m
<br />m
<br />-6590 - --
<br />'JUN 15 20M
<br />FINAL RECLAMATION TOPSOIL STOCKPILE WILL BE CREATED, USING I \ Division of Minerals and Geology
<br />EXCESS TOPSOIL TO BUILD A STOCKPILE IN THE NORTHWEST CORNER OF
<br />THE PHASE U PIT WHICH CAN HOLD UP TO 46,750 CU. 1D5. �O.F
<br />INITIAL MINING AND \ i�
<br />6. AS MINING NEARS COMPLETION_ IN PHASE /L TAP-SOIL- WATjRIAL_WILL -
<br />I ACII.ITIES AREA -PHASE \
<br />BE STRIPPED FROM 6.2 ACRES OF THE PHASE !ll PIT AND USED TO - - - - - - - _ _ _ _ - - - - - - - _ - ,�
<br />COVER THE REMAINING PIT DISTURBANCE AND THE PHASE 11 FACILITIES -- - - -- _ - / ' I� \ \
<br />- - - - - -- - - - � I DENVER
<br />AREA. ANY EXCESS MATERIAL WILL BE STOCKPILED ON THE FINAL
<br />TOPSOIL MATERIAL STOCKPILE.
<br />7 THE EXPOSED AREA REMAINING AT THE END OF PHASE 1/I WILL BE
<br />RECLAIMED AFTER THE COMPLETION OF MINING USING THE MATERIAL
<br />STOCKPILED IN THE FINAL. RECLAMATION TOPSOIL STOCKPILE AREA.
<br />Ariol Photography and contours provided by Data /LJUpping, Grand Junction Colorado
<br />LOUISIANA LAND AND GRAVEL COMPANY, LLC
<br />P.O. BOX 8419
<br />CLINTON, LA 70722
<br />.1. E. STOVER & ASSOCIATES
<br />210, Compass Dr.. Suite 101
<br />Grand 10_, ('0 01900
<br />1\
<br />N \ \" JUN 1 3 2003
<br />OFFIICE
<br />.r —
<br />_ a'nd Jmft4fw . a Of�oo
<br />Dirsion of R9inernt�0
<br />\� ;
<br />Permit #: 41 -,700o -O q Confidental ?: x,/
<br />Class: Retylsion Type -Seq.:
<br />From: Mt =. S4ojc7 d- sloe To: / piLt G
<br />{� Doc. Name: �C, _ F -,foyc fa Tra�1 P1e,7 ed,90
<br />S \ Doc. Date (if no date stamp): Lo- /3 - J9 {
<br />N
<br />wE
<br />S
<br />Designed By,
<br />Drawn By
<br />CNec4 <ed Byt
<br />-?E� /S/ONS LOUISIANA LAND & GRAVEL COMPANY, LLC
<br />1 GIVE INCH
<br />7
<br />D.A J
<br />J.
<br />D.A.✓.
<br />D.A.J.
<br />% 03
<br />04107
<br />03101
<br />RECLAMATION PLAN
<br />3.
<br />REV P'HASE07 PIT e& PERM BOUND
<br />REVISED ROAD ALIGNMENT
<br />2.
<br />DMG FILE NUMBER: M - 2000 - 049
<br />DWG NAME:
<br />EXHIBIT F
<br />D.A.J.
<br />3 2000
<br />1.
<br />N0.
<br />REVISED PHASE SEQUENCE AND ROAD
<br />SCALE:
<br />1 = 200
<br />REVISION
<br />BY
<br />DATE
<br />i
<br />I .
<br />�iL
<br />
|