My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-03-02_REVISION - M1979163
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1979163
>
2005-03-02_REVISION - M1979163
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:36:07 PM
Creation date
11/21/2007 10:56:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979163
IBM Index Class Name
Revision
Doc Date
3/2/2005
Doc Name
Comments
From
OSE
To
DMG
Type & Sequence
AM2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/-~'~?' 2 <br />STATE OF COLORADO <br />OFFICE OF THE STATE ENGINEER <br />Division of Water Resources <br />Department of Natural Resources <br />1313 Sherman Street, Roam 818 <br />Denver, Colorado 80203 <br />Phone (303) 866-3581 <br />FAX (303) 866-3589 <br />www.water.state.co.us / <br />Response to Reclamation Permit Application Consideration <br />DATE: March 2, 2005 v <br />TO: Kathleen L. Sullivan, Environmental Protection Specialist <br />CC: Division 2 Office; District 66 Water Commissioner <br />FROM: Don West, P.E. ~~ <br />RE: Shannon Pit, File No. M-1979-163 <br />Operator: Las Animas County <br />Contact: Phil Dorenkamp <br />Section I5, Twp 33 S, Rng 53 W, 6th P.M., Las Animas County <br />OF'~~/d <br />~ti_- R~ <br />h~ <br />• r <br />r <br />~ Ig~6 <br />Bifl Owens <br />Governor <br />Russell George <br />Executive Director <br />Hal D. Simpson, P.E. <br />State Engineer <br />CONDITIONS FOR APPROVAL <br />® The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground <br />water must not occur during or afrer mining operations. If stormwater is contained on-site, it must <br />infiltrate into the ground or be released to the natwal stream system within 72 hours, or all work <br />must cease until a substitute water supply plan, or augmentation plan approved by water court, is <br />obtained. Reclamation plans must ensure water will not be retained onsite for more than 72 hours <br />unless an augmentation plan approved by water court is obtained. <br />^ The proposed operation will consume ground water by: ^ evaporation, ^ dust control, <br />^ reclamation, ^ water removed in the mined product, ^ processing, ^ other:. <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a gravel pit <br />or other type of well permit, as applicable. However, prior to obtaining a permit, an approved water <br />supply plan or decreed plan for augmentation is required. <br />^ Frior to approving a well permit, the applicant must conduct a field inspection of the site and <br />document the locations of al] wells within 600 feet of the permit area. The applicant must then <br />obtain a waiver of objection from all well owners with wells within 600 feet of the permit area or <br />request a hearing before the State Engineer. <br />^ Other: <br />COMMENTS: <br />~/~~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.