Laserfiche WebLink
<br />Geotechnical Engineering Report <br />Gravel Evaluation <br />~• Northwest of Weld County Roads 18 and 25 <br />• Weld County, Colorado <br />Terracon Project No. 21035117 Terracon <br />stratum. However, estimated gravel sizes are limited by the sampling method utilized and are based <br />on field observations of the auger cuttings. Lenses of larger particle sizes may be encountered which <br />were not observed in the samples obtained. In order to use this material for typical construction <br />materials such as base course, concrete, and asphalt aggregate, extensive screening may be <br />required. This may generate large amounts of reject sand material. The material may be used without <br />• processing for structural fill and subbase material. To more accurately evaluate the quality of the <br />• granular material as well as the size of the particles, test pits should be dug at the site and detailed <br />• laboratory tests should be performed. <br />' Since the sand and gravel is below groundwater, dewatering of the pit will be required to excavate the <br />_ sand and gravel, or a drag line will be needed to remove the overburden and aggregate. <br />GENERAL COMMENTS <br />The analysis and recommendations presented in this report are based upon the data obtained from <br />the borings performed by Terracon at the indicated locations. This report does not reflect variations, <br />which may occur between Borings or across the site. The nature and extent of such variations may <br />not become evident until mining operations are performed. These variations may effect the quantity <br />and or the quality of the materials encountered. <br />The scope of services for this project does not include either specifically or by implication any <br />_ environmental assessment of the site or identification of contaminated or hazardous materials or <br />conditions. If the owner is concerned about the potential for such contamination, other studies should <br />be undertaken. <br />This report has been prepared for the exclusive use of our client for specific application to the project <br />discussed and has been prepared in accordance with generally accepted geotechnical engineering <br />practices. No warranties, either express or implied, are intended or made. In the event that changes <br />in the nature, design, or location of the project as outlined in this report, are planned, the conclusions <br />and recommendations contained in this report shall not be considered valid unless Terracon reviews <br />the changes, and either verifies or modifies the conclusions of this report in writing. <br />4 <br />