My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV89632
DRMS
>
Back File Migration
>
Revision
>
REV89632
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:11:31 AM
Creation date
11/21/2007 10:53:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Revision
Doc Date
6/6/1991
Doc Name
MR 91-60 SUBSTATION EXPANSION & GROUNDING UPGRADE PN C-82-056
Type & Sequence
MR60
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iii iiiiiiiiuiiiii- <br />C c~rp~us <br />~ Yampa Valley <br />Cyprus Yampa Valley Coal Corporation <br />29587 Routt County Road #27 <br />Oak Creek, Colorado 80467 <br />303-879-3800 <br />June 5, 1991 <br />Tony Waldron, Reclamation Specialist <br />Colorado Mined Land Reclamation Division <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203-2273 <br />Dear Mr. Waldron, <br />R~GEIV~~ <br />JUN ~ 1991 <br />Mined ~~nd <br />Reclamali0n Division <br />RE: Minor Revision 91-60. Substation Expansion and GroundinP Upgrade: <br />Permit C-82-056 <br />TCC is requesting a minor revision to the above-referenced permit to allow the expansion of <br />substation #1 and upgrading of the grounds at substations 2, 3, 4 and a number of existing <br />powerline poles. These measures will help avoid power outages which have occurred in the past <br />as a result of lightning strikes. <br />The expansion of substation 1 will entail the following: <br />1. Placement of a temporary powerpole to the west of the current substation to allow <br />rerouting of wires from a pole within the substation; <br />2. Material in a 30' X 50' area will be excavated down to bedrock on the west end of the <br />existing substation to allow installation of a ground mat. Material will then be placed <br />back on top of the ground mat, followed by a layer of sand and a layer of gravel; <br />3. For the expansion, a concrete slab measuring 22 feet by 15 feet will be constructed, and <br />transformer(s) and switches will be placed on this slab. <br />4. Within the substation, 2 power poles will be placed on the west end to support capacitors <br />and fuses for the substation's high voltage lines. The substation will then be fenced to <br />restrict access. <br />Drainage control for the substation will remain unchanged except for the existing culvert having <br />an extension welded on to allow backfilling and pad construction adjacent. Location of the <br />proposed substation expansion is shown on enclosed Map 24 (Surface Facilities and Freshwater <br />Systems). <br />
The URL can be used to link to this page
Your browser does not support the video tag.