Laserfiche WebLink
<br /> <br />The lessee, before issuance of the mine permit, will conduct an provide to BLM an inventory of all <br />existing state adjudicated water rights in and adjacent to the lease tract which may be impacted by <br />subsequent mining activities. At a minimum, this inventory will include: the water right holder, <br />location, source, amount of decree, beneficial use, historical flow, and the appropriation and <br />adjudication dates. <br />Existing cross-tract and on-tract water flaws shall be maintained by the lessee even following <br />release of the permit bond by the Colorado State Mined Land Reclamation Board. Compliance with <br />this mitigation shall be assured by an increase in the BLM administered lease bond for a monetary <br />amount and for a time period to be determined in consultation with state and federal authorities, <br />affected water users, and the lessee. <br />VI. <br />VII <br />8/2 7 /92 <br />RESIDUAL EFFECTS <br />The extraction and removal of 2.5 million tons of coal is the only irreversible or irretrievable commitment of <br />resources that will occur if Alternative One is implemented. <br />Subsidence could occur over areas that have been mined, the amount of surface that could be impacted is <br />undetermined and is expected to be insignificant. All other impacts will be mitigated by the mitigating <br />measures. <br />LIST OF PREPARERS <br />Lynn Lewis Minerals/All <br />Desty Oyer MineralslAll <br />Robert Welch Wildlife/Threatened & Endangered <br />Richard Fike Cultural Resources <br />Dennis Murphy Water Resources <br />Jeanette Pranzo Socioeconomics <br />Page 13 <br />