My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-03-18_REVISION - M2001069
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2001069
>
2002-03-18_REVISION - M2001069
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:57:05 PM
Creation date
11/21/2007 10:51:30 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001069
IBM Index Class Name
Revision
Doc Date
3/18/2002
Doc Name
Technical Revision
From
Asphalt Constructors Inc
To
DMG
Type & Sequence
TR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a/ <br />~A1T <br />RECEIVED <br />MAR 18 2002 / <br />"A Division of Minerals and Geology <br />/ s. <br />C <br />7040 W. Hwy. 160 P.O. Box 449 Alamosa, Co. 81101 (719) 589-6671 <br />March 15, 2002 <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Co 80203 <br />RE: Del Norte West Valley Pit ~ <br />Permit No. M-2001-069 / <br />Technical Revision <br />Dear Bob: <br />~JZ-- © ~ / <br />,~ecC;~t 7a8a <br />$ lam. c0 <br />We are planning to supply aggregates for the CDOT improvement project on <br />S.H. 149 between South Fork and Creede. This will require additional stockpile <br />area that lies with-in the permit boundary but outside the Phase I disturbance <br />area. <br />Please see the attached drawing for easy reference. The area comprises an <br />additional 6.92 acres. The northern boundary shall be the existing access road. <br />It extends 520' south of this road. The rectangle measures 520' north and south, <br />and 580' east and west. <br />_. M The only earthwork activity in this area will be the stripping and stockpiling of -J-`_ <br />topsoil prior to staging. This topsoil will be stored along the west boundary as <br />indicated in the original mining plan. The area will be used to store aggregate <br />stockpiles and a portable asphalt plant during the summer months. <br />Any excavation necessary for mining shall remain within the Phase I boundaries <br />established in the original permit application. Material will be stockpiled using <br />rubber tire loaders. Estimated reclamation costs are listed on the following page. <br />Equal Opportunity Employer <br />
The URL can be used to link to this page
Your browser does not support the video tag.