Laserfiche WebLink
<br />Mr. Schreiner <br />March 30, 1998 <br />Page 3 <br />We have decided to add as an attachment to this letter, a o~py of the <br />information requested from Colorado Lien. <br />CDG/arh <br />Enclosure <br />cc: Ms. Sam Lien (w/encl.) <br />Mr. Nathan Barton (w/encl.) <br />Sincerely, <br />PETE LIEN & SONS, INC. <br />Craig D. Grotenhouse <br />General Counsel <br />P.S. Please note that the total bonding cost (both quarries) on page 2 in the <br />amount of $971,317.00 is wrong. The total cost as calculated by Colorado Lien is <br />$987,858.00. I am attaching a hand written one-page sheet from Mile Golliher <br />showing the correction and the total reclamation cost of each of Reu and Owl <br />Canyon. <br />