Laserfiche WebLink
iii iiiiiiiiuiuiii <br />l6. Description of Results Achieved: <br />All surface facilities, except those approved for and consistent with post mining land use, have been <br />removed. Buildings were sold, disassembled and transported to off-site locations for use by new owners. <br />Steel structures were salvaged for scrap. Concrete foundations were disposed of on site at the designated <br />concrete disposal area. Disturbance areas were returned to approximate original contour. Topsoil was <br />redistributed in accordance with the approved reclamation plan. Drainage from the reclaimed aeeas (other <br />than SAE's) have been directed to ponds 3 and 4. These ponds will remain until vegetation requirements <br />have been met. Erosion control for SAE's will be maintained consistent with permit requirements until <br />suitable vegetation has been established and, or the establishment of satisfactory erosion control <br />demonstrated. <br />17. Copies of Required Notification to Interested Parties: Enclosed <br />18. Newspaper Advertisement and Proof oC Publication: ~ Enclosed <br />ADDITIONAL PHASE I BOND RELEASE REQUIREMENTS <br />1. As-built Post Mining Topography Map: Enclosed <br />2. Certified Cross-sections: <br />Enclosed <br />3. Documentation of Drainage Re-establishment: Drainages are shown on the enclosed Certified Post <br />Mining Topography Map. <br />4. Documentation that Drainage Control is in Accordance with the Approved Plan: Drainages are <br />shown on the enclosed Certified Post Mining Topography Map; theses have been constructed in ~ <br />accordance with the approved post mining reclamation plan (technical revision 43). <br />