Laserfiche WebLink
<br />RECLAbV~T10N PLAN <br />EXHIBIT E <br />The reclamation plan proposed by this technical revision is to <br />construct one groundwater lake. The lake shorelines will be <br />revegetated using the seed mix that was approved for the original <br />permit, following backfilling and grading. The reclamation of the <br />land will take place concurrently with mining operations. In <br />creating one lake, the access road to the property owners house <br />will be re-routed around the south end of the lake but will <br />continue to use the existing access point on Old Brighton Road. <br />(See Exhibit F). <br />All other conditions and recommendations to <br />reclamation plan will be followed. <br />the existing <br />E-1 <br />