My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV89278
DRMS
>
Back File Migration
>
Revision
>
REV89278
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:11:13 AM
Creation date
11/21/2007 10:50:06 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
4/10/1997
Doc Name
PERMIT REVISION NO 7 MOUNTAIN COAL CO C-80-007
From
DMG
To
MICHAEL BOULAY
Type & Sequence
PR7
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IIIIIIIIIIIIIIII <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Depanmenl of Natural Resources <br />1313 Sherman SL, Room 215 <br />Denver, Colorado 80203 <br />Phone: 1303) 866-3567 <br />FAX: 1303) 8328106 <br />DATE: April 9, 1997 <br />TO: Michael Boulay <br />FROM: Jim Pendleton <br />RE: West Elk a ntain Coal Company) - <br />Permit Revlslon No. PR-07 -Response to <br />Geotechnical Adequacy Comments <br />(Permit No: C-80-007) <br />Introduction <br />~~ <br />~~~ <br />DEPARTMENT Off? <br />NATURAk <br />RESOURCE" <br />Roy Romer <br />Governor <br />lames S Lochhead <br />Executive Director <br />M¢hael 8. Long <br />Division Dueaor <br />I have reviewed the response to our adequacy comments submitted by Mountain Coal Company <br />(MCC) for their Permit Revision No. PR-07. This revision proposes expansion of their surface <br />facilities area into upper Sylvester Gulch at the West Elk underground coal mine in the North <br />Fork of the Gunnison River Valley. MCC proposes to construct two ventilation shafts to their <br />workings in the B-Seam. These shafts, intake (34' diameter) and exhaust (28' diameter), will <br />penetrate approximately 700 feet in depth. In addition, MCC proposes to install ancillary <br />facilities, including an electrical substation, an electric bore to deliver electrical power to the B- <br />Seam workings, a power line to power the substation, and various light-use and haul access <br />roads to access the facilities. The Division issued it's adequacy comments to MCC in January. <br />MCC subsequently submitted responses to our adequacy comments. I have concentrated my <br />review upon the information submitted in response to adequacy comments which I authored <br />regarding geotechnical topics. <br />Attachment: <br />cc: Dave Berry <br />Susan McCannon <br />Doc: M:\COAL\JAP\MTG1PR07.SUP <br />JP/jp <br />
The URL can be used to link to this page
Your browser does not support the video tag.