Laserfiche WebLink
<br /> <br />iUPJ 2 ? 1983 <br />RECLAMATION COSTS MINED LAND RECLAMATION <br />(revised June, 1983) <br />Colo. Dept. of Natural Resource <br />We will use the same method of refiguring the reclamation costs <br />that the board accepted when they granted this permit in October, <br />1981. We have assumed that Stages 2 and 3 will be the two <br />consecutive stages that require the most reclamation. <br /> ACRES <br />PHASE PERCENT YEARS TOTALS WATER ROAD RDVEGE- BACK- <br /> DISTURBED T.STION FILL <br />2 25 A; 4-6 43.70 37.35 0.64 1.38* 4.41 <br />3 75~ 4-6 29.29 24.22 0 3.88** 2.34 <br />5 100SK LOM 19.71 -- -- 1;9.71 -- <br /> <br />TOTALS 92.70 61.75 0.64 24.89 6.75 <br />* calculations are based on a time when reclamation will be 75~ <br />*• complete in Stage 2 end mining is 25A6 complete in Stage 3 and <br />Stage 5 is disturbed as plant site and only needs resoiling <br />and smoothing. <br />The estimate of reclamation costs is based on lithe following <br />prices: <br />Cost/acre <br />Grass seed mixture, 11 1/2 lbs. @ $1.85/lb.......... $ 21.28 <br />Fertilizer (assume: actual will depend <br />on soil analysis), nitrogen-phosphate <br />(18-46-0) @ $9.60/1001bs ............................ 9.60 <br />Backfilling, 8hr @ $45.00/hr. ................. 360.00 <br />Grading and shaping, 4hr @ $70.00/hr .............. 280.00 <br />Resoiling and smoothing, °** .... ................ 833.00 <br />Seed drilling and fertilizing, 1.SOhr .~ <br />@ $45.00/hr.. ... .. ..................... 67.50 <br />Labor, 16 man hours.@$6.50/hr. .................. 104.00 <br />Trees, 500 bare root @ $20.00/100.trees ............. 100.00 <br />**• Cost of moving 10" of topsoil to disturbed <br />land at a cost of $0.62 per yard. <br />