My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV89219
DRMS
>
Back File Migration
>
Revision
>
REV89219
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:11:10 AM
Creation date
11/21/2007 10:49:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Revision
Doc Date
9/28/2006
Doc Name
Proposed Decision Letter & Form
From
DRMS
To
Trapper Mining Inc.
Type & Sequence
TR97
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~-. <br />STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 8663567 <br />FAX: (303) 832106 <br />September 28, 2006 <br />Forrest V. Luke <br />Trapper Mining Inc. <br />P.O. Box 187 <br />Craig, CO 81626 <br />~~~~~~~ <br />Re: Trapper Mine (Permit No. C-1981-010) <br />Proposed Decision -Technical Revision No. 97 (TR-97) <br />2005 Annual Report <br />Deaz Mr. Luke: <br />COLORADO <br />DIVISION OF <br />RECLAMATION <br />MINING <br />SAFETY <br />Bill Owens <br />Governor <br />Russell George <br />Executive Director <br />Ronald W. Cattany <br />Division Director <br />Natural Resource Trustee <br />Enclosed you will fmd the Division of Reclamation, Mining and Safety's Proposed Decision for Technical <br />Revision No. 97 at the Trapper Mine. Notice of the proposed decision will be published in the Craig <br />Daily Press as soon as possible. The first publication will initiate the ten (10) day public comment period <br />for the Division's decision. <br />Documentation must be submitted to the Division demonstrating that a copy of the approved revision <br />application was sent to the Office of Surface Mining and the Bureau of Land Management. The material <br />should be sent within I S days of final approval. <br />Please refer to the Performance Bond heading on the enclosed proposed decision form. If the amount of <br />Bond Held equals or exceeds the Revised Liability, you need not submit additional bond. However, if the <br />Revised Liability exceeds the Bond Held, please submit additional bond or rider to your existing bond <br />that equals or exceeds the Revised Liability. Tlus Technical Revision must not be implemented until this <br />proposed decision becomes final and until any required increase in bond is submitted to and approved by <br />the Division. <br />If you have any questions, please contact me. <br />Sincerely, <br />JHB/Ahd <br />Enclosure <br />cc: Cazl Johnston, Office of Surface Mining, with enclosures <br />M:!OSS\ahd\temp\C-TR-0fi_CI981010_1FiB_20060928_24622 PM.doc <br />Office of Office of <br />Mined Land Reclamation Active and Inactive Mines <br />
The URL can be used to link to this page
Your browser does not support the video tag.