Laserfiche WebLink
Rug 07 03 11:32a <br />p.2 <br />~~ <br />PIONEER <br />SAND COMPANY lNC. <br />August 7, 2003 <br />Mr. Thomas A Schreiner <br />State of f nlnrado <br />Division of Minerals and Creoingy <br />C)epartme~tt pfKatural Resources <br />1313 Sherman St., Rome 215 <br />Denver, CO 80203 <br />RE: Ingleside Quarry -Adequacy Comments <br />Permit # M-19$0-037 <br />Dear Mr. Schreiner: <br />The following is itt response to your letter dated July 29, ~U03. Each paragraph number <br />is a reply to the correspuntliuk paragraph of your letter. The majrnity of this reply is <br />based on Ron Tui net's (K-S & Cotnpany, lnc.) Pax dated August 5, ZUO.i (Attached). <br />1 . There seccua to be dit;=ercnt schools of thought regarding fcrtllizer, Please refer to <br />Tuntcr's reply. <br />#Z; #3, f/5, ~, #7 Reter to 'T'urner's fax. <br />~~ The $t 3acuhir. yard blasting cost does include drilling. We have used Xenter <br />131astiug for several years. The cast has remained the same. <br />#6 We agree with'l'eaacon's reconuueudations and will commn to the necessary <br />measures to achieve such. <br />The pit floors, stockpile and processing areas shall remain generany flat, but with <br />enough slop, to the south and east to prevent ponding. E~usivn control tncasures <br />such as diversion ditchav, Jury bales and rip rap cheek spins will Uc used in <br />problem areas. <br />#8 Terracon's reeomtnendations seem lu concur with the hluating contractors we <br />have contacted for blasting estiu~ales. <br />F.O. Box 7650 • Colorado Springs. Colorado 80933-%650 • (719) 599-8100 <br />