Laserfiche WebLink
Memo to Jim Burnell <br />West Elk Mine, M.R. - 2~6, Geotechnical Adequacy <br />page 2 <br />their permit area, such as the waste pile expansion and road cut slopes throughout <br />Sylvester Gulch. These monuments should be monitored at least quarterly in July, <br />October and January, and monthly from April through June. <br />With the imposition of these two monitoring conditions, 1 recommend approval of M.R. - 256. <br />cc: Larry Routten <br />doc: M:\COAL\JAP\MTGTR2~6.WPD <br />JP/JP <br />