Laserfiche WebLink
STATE OF COLORADO <br />OFFICE OF THE STATE ENGINEER <br />Division of Water Resources <br />Department of Natural Resources <br />t 313 Sherman Street, Room 818 <br />Denver, Colorado 80203 <br />Phone (303) 866-3581 Res onse to Reclamation Permit A hcation Consideration <br />FAx (303) 866-3589 P PP <br />www.watecstate.co.us <br />DATE: January 10, 2006 F~ E C E ~ ~/ E <br />TO: Berhan Keffelew, Environmental Protection Specialist <br />.IAN i 0 ?i.;;S <br />CC: Division 2 Office <br />FROM: Sarah K. Reinsel, E.LT. Division of Minerals and Geology <br />RE: Operator: Rocky Mountain Materials & Asphalt, Inc., Sokol Pit, File No. M-1980-193 <br />Section 22, Twp 12 S, Rng 62 W, 6th P.M., El Paso County <br />oF'coto <br />~~~ ~~ <br />t r <br />t Y <br />~/8]6{ <br />Bill Owens <br />Governor <br />Russell George <br />Executive Director <br />Hal D. Simpson, P.f. <br />State Engineer <br />CONDITIONS FOR APPROVAL <br />® The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground water must not <br />occur during or after mining operations. <br />^ The proposed operation will consume ground water by ^evaporation, ^dust control, ^reclarrtation, ^water <br />removed in the mined product, ^processing, ^other: <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a gravel pit or other type <br />of well permit, as applicable. Prior to obtaining a pemri[, an approved water supply plan or decreed plan for <br />augmentation is required. <br />^ Prior to approving a well pemtit, the applicant must conduct a field inspection of the site and document the <br />locations of all welts within 600 feet mile of the permit area. The applicant must then obtain a waiver of <br />objection from all well owners with wells within 600 feet of the permit area or contact this office regarding the <br />600 foot spacing notificatiorJhearingpmcess. <br />^ The proposed operation may have potential impact on existing water rights near the project location. Please <br />provide evidence that the proposed project will not alter or impact the historic operation of existing water rights. <br />® The applicant has indicated plans to use ground water or other water for material washing purposes at the permit <br />site. The applicant will need to provide evidence to this office that the water is permitted or decreed for such <br />uses. <br />® Other: The applicant has indicated plans to construct a[ least one rainwater detention pond to contain any runoff <br />from the site. The State Engineer's Office does not allow for the storage of water out of priority -however, i[ is <br />the policy of the Slate Engineer to allow the detention of rainwater in a pond for up to 72 hours. Futhermore, any <br />such rainwater may not be used for any purpose without first obtaining a corresponding Water Court decree. <br />COMMENTS: <br />