My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV89053
DRMS
>
Back File Migration
>
Revision
>
REV89053
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:11:03 AM
Creation date
11/21/2007 10:48:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981048
IBM Index Class Name
Revision
Doc Date
1/8/1981
Doc Name
RESPONSE TO ADEQUACY COMMENTS IN LETTER OF 12//8/80
From
MINERAL RESOURCES AND ENGINEERING INC
To
MLRD
Type & Sequence
HR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />rut. ruClinrr sAVAC;r <br />Page 5 <br />January 7, 1931 <br />best to stipulate final design on this until the permanent <br />program submission. iC you want you can check the design based <br />on the fact that two five foot culverts are in place. <br />The remainder of Bob's croncerns have been included <br />in Darry's letter to Jim Kent. <br />Additional Information <br />1) Copy of proofs of publication and adjacent landowner notification <br />aze enclosed. Note, the siynecl return receipts will be forwarded to you <br />upon our receipt of the sam . <br />2) Loadout. <br />a) A copy of the agreement letters between iYinidad <br />Basin Mining, Inc. and the Atchison, Topeka and Santa Fe <br />Railway Company for use of the railroad siding as a coal <br />loadout. <br />b) A copy of the publication notice and the land- <br />o+mer notification. It should be noted that the loadout <br />is contained within the boundaries of the AT&SF Railway <br />Company. <br />c) 7be operation plan for the loadout facility is <br />rather basic. Coal is hauled in from the mine by semi- <br />tractor trailer tricks and dun~xd into the crusher. NCYI'E: <br />Coal may be stockpiled at t}ie loadout prior to and after <br />crushing deuending on equipment availability and trans- <br />portation requirements. 7Y~e coal is then crushed to the <br />various sizes required by the u.;ers and stockpiled. The <br />stockpiled coal is then loaded into the awaiting railroad <br />cars Eor trmisport to the respective markets. The coal <br />will he sprayed with a chemical dust suppression product <br />to control dust. <br />The area has historically been used as a coal <br />loadout facility prior to '1'BM's obtaining the lease and as <br />such no topsoil was availe~ble for salvaging. In fact, a <br />drill hole indicaCccl that the area had been previously used <br />at least four times as a coal loadout. This was readily <br />' seen in'the~everburden profile. <br />The seclirm.~it control system will be comprised of <br />two sediment ponds and collection ditches leading into the <br />ponds. '17~e designs of the ponds and ditches are as follows: <br />
The URL can be used to link to this page
Your browser does not support the video tag.