My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-06-09_REVISION - M1982015
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1982015
>
2006-06-09_REVISION - M1982015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:56:17 PM
Creation date
11/21/2007 10:46:34 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982015
IBM Index Class Name
Revision
Doc Date
6/9/2006
Doc Name
Stormwater Management Plan
From
Carroll & Lange Inc.
To
DMG
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STORMWATER MANAGEMENT PLAN (SWMP) <br />AND EROSION AND SEDIMENT CONTROL REPORT <br />FOR <br />ST. VRAIN LAKE GRADING IMPROVEMENT PLANS <br />Page 3 <br />seeded if the weather is appropriate for successful seed germination. The <br />BMP phasing plans are provided in map pockets at the end of this report. <br />E. Proposed Construction Sequence <br />The general sequence for major construction activities will be as follows: <br />1. Project Implementation <br />The following general sequence of activities will be followed in the <br />construction process. <br />a. Appoint a SWMP Administrator. <br />b. Install/construct temporary or permanent erosion control BMPs, as <br />appropriate. Install temporary sediment ponds. <br />c. Grade the construction site, as appropriate. <br />d. Areas where utility installation will not begin immediately (future <br />r phases) will be temporarily re-seeded. Phases that are proceeding <br />. ~ with the utility and road construction sequence will not be seeded at <br />this time because they will be active construction areas that will not <br />be dormant for more than 30 days. <br />This construction sequence will be scheduled to allow for no lapse in <br />activities of more than 30 days. Once this sequence of construction <br />activities has been completed, areas where construction will not begin <br />within 30 days will be surface roughened (within 14 days) to reduce <br />erosion potential and promote infiltration and will be temporarily seeded <br />if the weather is appropriate for successful seed germination. <br />e. Implement construction activities related to the construction of <br />roads including debris management, spoil piles and soil stockpiles. <br />Install specific BMPs as shown on the Stormwater Management <br />Plan (SWMP) sheets, to provide erosion protection prior to <br />landscaping and re-vegetation. <br />~~, <br />
The URL can be used to link to this page
Your browser does not support the video tag.