Laserfiche WebLink
SEDIMENTATION VOLUME vs. STAGE <br /> for <br /> SEDIMENTATION POND 4 <br />PROJECT NAME: ST. VRAIN LAKES FILING NO. 1 DATE: 6/612006 <br />PROJECT NO.: 3075 DESIGN BY: MMU <br /> <br /> ACCUMULATED <br /> INCREMENTAL TOTAL TOTAL <br /> ELEV. AREA FPZ STAGE FT VOLUME (FT3 VOLUME PC3) VOLUME (AC-Ei') <br /> 4869.00 2,957 0.00 0 0 0.00 <br /> 4870.00 4,406 I.00 3,657 3,657 0.08 <br /> 4871.00 5,884 1.00 5,127 8,784 0.20 <br /> 4872.00 7,472 1.00 6,662 15,446 0.35 <br /> 4873.00 9,161 1.00 8,302 23,748 0.55 <br /> <br />4874 <br />00 TOTAL VOLUME(FT3) <br />. <br />4873 <br />00 <br />. <br />4872 <br />00 <br />. <br />4871 <br />00 <br />. <br /> <br />4870 <br />00 <br />~ <br />. <br />a <br />N <br />4869 <br />00 <br />. <br />4868 <br />00 <br />. <br />4867 <br />00 <br />. <br />4666 <br />00 <br />. <br />0.0 0.1 0.1 0.2 0.2 0.3 0.3 0.4 0.4 0.5 0.5 0.6 0.6 <br /> VOLUME (AC-FT) <br />Sedimentation Volume =0.28 ac-ft <br />Stormwater Capture Volume = 0.28 ac-ft <br /> <br />CARROLL LANGE, INC. 6/6/2006 <br />