My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV88921
DRMS
>
Back File Migration
>
Revision
>
REV88921
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:10:57 AM
Creation date
11/21/2007 10:46:31 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999034
IBM Index Class Name
Revision
Doc Date
8/30/2000
Doc Name
TR FULTON WILDLIFE AREA PN M-1999-034 SLURRY WALL CONSTRUCTION REPORTING REQUIREMENTS
From
RMC
To
DMG
Type & Sequence
TR2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• iii iiiiiiiiiiiii iii <br />ROCKY MOUNTAIN CONSULTANTS, INC. <br />• <br />~~ <br />RECEIVED <br />AUG 3 0 2000 <br />August 29, 2000 <br />Ms. Christina Kamnikar <br />Division of Minerals and Geology <br />Department of Natural Resources <br />1313 Shemlan Street, Room 215 <br />Denver, Colorado 80203 <br />Division of Minerals and Geology <br />Premiere Building <br />825 Delaware Ave.. Suire 500 <br />LongmonT, CO 80501 <br />(303) 772-5282 <br />Metro (303) 665-6283 <br />FAX (303) 665-6959 <br />E-mail rmclong~rmil.com <br />RE: Technical Revision, Fulton Wildlife Area, Permit#M-1999-034 - <br />Slurry Wall Construction Reporting Requirements <br />Dear Christina: <br />CAMAS Colorado, Inc. (CAMAS), will comply with the "Regulated Construction Option" requirements <br />outlined in the March 29. 2000, Minerals Program Policy Mema regarding "Policy on Application <br />Reviews Involving Lined Sand and Gravel Pits." CAMAS has already provided design drawings and <br />specifications for the installation of the slurry wall along with a quality assurance/quality control plan. Per <br />the requirements, CAMAS will: <br />• Provide a cons[mction report detailing the installation of the slurry wall, describing any problems <br />that occurred, and listing the results of testing that was conducted under the approved quality <br />assurance/quality control plan. <br />• Provide a certification from the quality assurance engineer that the slurry wall was constructed in <br />accordance with [he approved plans and specifications. <br />Please call me if you have any questions. Thank you for your assistance. <br />Sincerely, <br />ROCKY MOUNTAIN CONSULTANTS, INC. <br />~~v~ <br />Barbara Brunk <br />Landscape Architect <br />cc: Norm Roche, Camus Colorado Inc. <br />H:\4919_001\CcwlFu ImTRresp.wpd <br />CIVIL AND ENVIRONMENTAL ENGINEERING • PLANNING <br />
The URL can be used to link to this page
Your browser does not support the video tag.