Laserfiche WebLink
Page 2 <br />31 ade uate <br />As a general comment, I still recommend a consolidated monitoring plan -for all monitoring. It <br />would summarize what, where, how, when, and why, and how results are reported for all seismic <br />monitoring such as on page 2.05-22, all water monitoring, etc. The EPS will have to do it <br />eventually to monitor compliance. <br />A sketch of "Possible Additional Longwall Reserves" on Figure 1 of Volume IIIA, Tab 20, <br />should not even be an indication of Division approval for such mining. Rather than qualify, it <br />might be removed. <br />Files: Support, C-96-083 <br />C:\bgw\My Documents\Support\96083 Bowie 2\C-96-083 PR 10 review.doc <br />M:\coal\jjd\C-96-083 PR 10 review.doc <br />