Laserfiche WebLink
<br /> <br />B.7.4 Rip rap transportation - $675 <br />B.7.5 Rip rap placement - $2,120 (includes collection pond) <br />B.8 Collection Pond - $ 62,915 <br />B.8.1 Liner disposal - $800 <br />B.8.2 Backfill -loader = $14,145, trucks = $47,970 <br />C) Mill Facilities - $647,764 <br />C.1 Building demolition & removal - 1,492,737 cu-ft @ $.22/cu-ft = $328,402 <br />C.2 Concrete floor and containment removal costs - 43,898 sq-fr @ $3.23/sq-ft = $141,790 <br />C.3 Five inch concrete floor removal - 8,250 sq-fr @ $5.05/sq-fr = $41,663 <br />C.4 Rip mill azea - 23.5 acres @ $90/acre = $2,115 <br />C.5 Grade mill azea - 23.5 acres @ $330lacre = $7,755 <br />C.6 Topsoil placement - $2,310/acre for 23.5 acres X54,285 <br />C.7 Topsoil grading - $257/acre for 23.5 acres = $6,040 <br />C.8 Rip ROM stockpile azea - 22 acres @ $90/acre = $1,980 <br />C.9 Grade ROM azea - 22 acres @ $330/acre = $7,260 <br />C.10 Topsoil placement ROM azea - $2,310/acre for 22 acres = $50,820 <br />C.11 Grade topsoil ROM azea - $257/acre for 22 acres = $5,654 <br />D) Roads and Pazking Area - $104,545 <br />D.l Ripping - 35 acres @ $90/acre = $3,150 <br />D.2 Grading - 35 acres @ $330/acre = $11,550 <br />D.3 Topsoil placement - 35 acres @ $2,310/acre = $80,850 <br />D.4 Grade topsoil - 35 acres @ $257/acre = $8,995 <br />E) Road Maintenance - $41,760 <br />E.1 Water truck - 8 hours x 6 timeslyeaz x 6 years z $75/hr = $21,600 <br />