Laserfiche WebLink
BOWIE N0.2 MINE <br />Technical Revision No. 27 -List of Revised Pages <br />Submittal Dated June 18, 2003 <br />I. Pages 2.04-69 and 2.04-70 in Volume I; <br />2. Pages 2.05-14 through 18, 19i, 19ii and 38 in Volume I; <br />3. Maps Nos. 15-1, 2Q 22-B, 22-C, 27 and 32 in Volume II; <br />4. Pages Exh-8-li, 15, 31, 32iii, 32iv, 42, 44, 51, 52, 53, 54, 56, 57, 58i, 58iv, 58viii, <br />65, 66, 68, 69 and 74 in Tab 8 of Volume III. <br />Submittal Dated August 13, 2003 <br />5. Pages 2.05-19, 20 through 27, 2.05-39 through 44 and 2.05- 45i in Volume I; <br />6. Maps Nos. 15-2, 16, 18, 21-1, 21-2 and 26 in Volume II; <br />7. Pages Exh-8-27 through 29i, 40 and 191 through 196 in Tab 8 of Volume III; <br />8. Four page biological opinion, dated July 29, 2003 in Tab 9 of Volume III. <br />9. Geotechnical Engineering Report, Coal Prepazation Facility, dated August 11, <br />2003, in Tab 10 of Volume VII; <br />10. Geotechnical Engineering Study, B-Seam Portal Bench, dated July 30, 2003, in <br />Tab 10 of Volume VII. <br />Submittal Dated August 21, 2003 <br />l 1. Page 2.05-45 in Volume I; <br />12. Map No. 18 in Volume II; <br />13. Proof of payment letter to National Fish and Wildlife Foundation, dated August <br />11, 2003 in Tab 9 of Volume III. <br />Reclamation Cost Estimate <br />14. One summazy sheet and four task sheets. <br />c:/word/bowie2/tr271ist 1 <br />